Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Kentucky Commission Approves New Transmission Line

The Kentucky Public Service Commission has approved a proposal by East Kentucky Power Cooperative Inc. to construct an electric transmission line in Clark, Madison and Garrard counties.

EKPC requested a certificate to construct 35.6 miles of 345 kV transmission line from the J.K. Smith Generating Station in Clark County to the proposed West Garrard substation near Lancaster. Nine miles of the line would be constructed on new right of way and 14.8 miles would be built parallel to an existing transmission line. The remaining 11.8 miles would consist of a rebuild of existing transmission lines.

In the order, the PSC said that selected route is preferable because it requires the least amount of new right of way and thus affects fewer property owners. The PSC has urged utilities to locate new lines to minimize the need for right of way acquisition. The PSC noted that, at a cost of about $38 million, the route is the most expensive of the three best options identified by EKPC.

The PSC said that “it is mindful of the concerns of landowners and local residents” who did not want the line on or near their properties. While some properties crossed by the line may lose value, the PSC noted that the determination of the amount of any compensation to those landowners falls outside its jurisdiction

The PSC found that EKPC demonstrated that the line is needed to serve growing demand. The line would carry power from new generating units to be built at the Smith station.

The order grants EKPC limited flexibility to move the planned location of the line in order to address unexpected construction issues. However, any major changes to the route will require the utility to file a new application.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues