Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Electric Transmission Texas Partners With Wind Coalition To Analyze New TransmissionTo Support Wind Generation

Every dollar spent for construction of new transmission lines to support the development of wind resources in Texas will result in a $5 to $7 reduction in energy costs, according to testimony filed Tuesday with the Public Utility Commission of Texas (PUCT) by Electric Transmission Texas LLC (ETT), a proposed joint venture between subsidiaries of American Electric Power and MidAmerican Energy Holdings Co.

The testimony, which was submitted as a part of the PUCT's Competitive Renewable Energy Zones (CREZ) Docket, supports a study by the Electric Reliability Council of Texas (ERCOT) through ETT's own analysis while at the same time providing an additional analysis sponsored jointly by ETT and The Wind Coalition, a group of large wind developers, equipment suppliers and public interest organizations promoting wind development in the south central United States. The jointly sponsored study focused on the benefits of new transmission to support wind resources throughout the state and did not specifically address the ETT proposal filed in the CREZ Docket.

"The jointly sponsored analysis validates the conclusions of the earlier ERCOT study, which indicated that consumers would save between $221 million to $1.278 billion per year with the addition of 1000 to 5250 MWof wind generation," said Calvin Crowder, ETT executive director. "In fact, the study jointly sponsored with The Wind Coalition, as well as our own separate analysis, concludes that the savings initially projected by ERCOT are conservative.

"Clearly, there is a strong economic case for moving forward to build new transmission lines to ensure the development of wind resources throughout the state," Crowder continued. "At the same time, we advocate seizing upon what we see as a unique opportunity to address the long-term transmission needs within ERCOT."

ETT has proposed the construction of approximately 1000 miles of transmission lines to support development of Competitive Renewable Energy Zones in Texas. At the same time, ETT proposes consideration by the PUCT and ERCOT of a high-voltage, high-capacity backbone transmission system to support long-range reliability and customer growth needs facing the state.

The first two stages of the ETT Transmission Plan will deliver up to 10,000 MW of existing and planned renewable energy from Competitive Renewable Energy Zones in north and central West Texas to major load centers along the I-35 corridor from north Dallas-Fort Worth area to the Austin-San Antonio area. The combined cost of these two phases is estimated to be approximately $3 billion with completion of Stage One anticipated by 2012 and Stage Two by 2015, based upon AEP's experience with past transmission projects in Texas.

Stage Three of the ETT Transmission Plan will establish a transmission backbone within ERCOT through the construction of an extra high-voltage bulk power delivery system. Stage Three of the ETT Transmission plan, estimated to cost approximately $4 billion, is conceptual and long-term in its approach and could change significantly as part of the PUCT and ERCOT evaluation process.

Definitive paths for the proposed projects have not been determined, and will not be determined, without ample opportunity for public input. The proposal is not exclusive; other transmission developers will be welcome to participate.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

News Releases

Amy Fischbach

The Briefing Room


Amy Fischbach

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue

Browse Back Issues