Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

FERC Directs NERC to Revise Definition of Bulk Electric System

The Federal Energy Regulatory Commission has finalized a decision to protect the reliability of the nation's bulk power system by modifying the definition of transmission facilities subject to mandatory reliability standards.

The final rule directs the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization, to revise its definition of the term “bulk electric system” to ensure that the definition encompasses all facilities necessary for operating an interconnected electric transmission network. FERC issued a Notice of Proposed Rulemaking (NOPR) on this matter March 18.

In the ruling, FERC said the ultimate goal of the final rule is to eliminate inconsistencies across regions, eliminate the ambiguity created by the current characterization of the 100 kV threshold as a general guideline, provide a backstop review to ensure that any variations do not compromise reliability, and ensure that facilities that could significantly affect reliability are subject to mandatory rules.

The best way to accomplish these goals is to eliminate the regional discretion in the current definition, FERC said, and maintain the bright line threshold that includes all facilities operated at or above 100 kV and establish an exception process and criteria for excluding facilities that are not necessary for operating the interconnected transmission network.

Alternatively, FERC will allow the ERO to develop its own proposal to address the Commission’s concerns. Any alternative proposal must be as effective as or more effective than the Commission’s approach and may not result in a reduction in reliability. The ERO should file a revised bulk electric system definition within one year of the effective date of this order.

The final rule is effective 60 days from publication in the Federal Register.

In other reliability-related action today, FERC:

  • Issued a proposed rulemaking (RM10-15-000) on three new Interconnection Reliability Operations and Coordination (IRO) Reliability Standards proposed by NERC and seven modified Reliability Standards. The proposed Reliability Standards were designed to prevent instability, uncontrolled separation or cascading outages that harm the reliability of the system; and
  • Issued a final rule (RM09-25-000) approving two proposed Personnel Performance, Training and Qualifications (PER) Reliability Standards requiring reliability coordinators, balancing authorities and transmission operators to establish training programs for their system operators. The rule directs NERC to take action with respect to operator training but does not require NERC to modify the two standards.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues