Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

FirstEnergy Companies File Application for Geauga County Transmission Line

FirstEnergy Corp. has announced that its American Transmission Systems Inc., (ATSI) transmission subsidiary, and its Cleveland Electric Illuminating Company (CEI) electric utility company have filed a complete construction application with the Ohio Power Siting Board (OPSB). The project -- to construct a new 138-kV transmission line and substation in northeast Ohio -- is designed to serve parts of Geauga and Ashtabula counties. In Ohio, the OPSB is responsible for approving the location of major utility facilities.

As part of the process, a copy of the complete application also was provided to public officials in Geauga and Lake counties, and copies were placed in local libraries in Burton, Chardon, Madison, Middlefield, Morley and Thompson for local residents to review.

"Geauga County and parts of Ashtabula County have experienced significant residential, commercial, and industrial growth over the last eight or so years, far outstripping average load growth in our Ohio service areas," said Richard R. Grigg, executive vice president and chief operating officer for FirstEnergy. "This transmission project is designed to help us continue to provide safe and reliable electric service to our customers in the region."

FirstEnergy worked with URS, a nationally known engineering firm specializing in transmission issues, to determine the best route for the project. As required by OPSB regulations, the application includes descriptions of a preferred and alternate route for the proposed transmission line:

  • Preferred Route -- It largely follows a cross-country route originating  at a new substation that will be built to the west of CEI's existing  Huntsburg Substation on Mayfield Road in Huntsburg Township. From  there, the preferred route runs north for approximately 14.7 miles,  through portions of Huntsburg, Montville and Thompson townships in  Geauga County and into Madison Township in Lake County where it  interconnects with ATSI's existing 138-kV Mayfield-Ashtabula  transmission line. This mostly rural route would cross approximately  87 properties. 
  • Alternate Route -- It largely follows a road corridor route located  adjacent to Clay Street, and originates at a new substation that will  be built near the intersection of Clay Street and Mayfield Road in  Huntsburg Township. From there, the alternate route runs north for  approximately 12 miles through Huntsburg, Montville and Thompson  townships to a point in Thompson Township where it interconnects with  ATSI's existing 138-kV Mayfield-Ashtabula transmission line. This  road-corridor route would cross approximately 182 properties.

With the completed application now filed, the OPSB will appoint an Administrative Law Judge (ALJ) to conduct hearings on the merits of the proposed line. The ALJ will establish dates for public and adjudicatory hearings in this case. Once these dates are scheduled, the company will publish two separate public notices in local newspapers, advising of the date, time and place for the public hearing, which will be held in Geauga County and will provide all interested parties the opportunity to speak regarding the project.

The adjudicatory hearing will be held at the OPSB's offices in Columbus, and will provide an opportunity for ATSI, CEI, OPSB staff and other interveners to call and examine witnesses regarding the project. OPSB staff now are reviewing the application, and will issue a staff report and recommendation 15 days before the public hearing.

Following the hearing process, the OPSB will make the decision as to whether the Geauga County transmission line project should go forward and, if so, the routing for the project. A decision is expected in mid-2008.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues