Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

IEEE BPL Working Group Approves Provisions for MAC/PHY, Inter-System Protocol

The IEEE working group devoted to developing a standard for Broadband over Power Lines (BPL) met in Las Vegas in May, where it devoted its attention to the work of its technical subgroups.

The working group is developing a new standard, IEEE P1901, "Standard for Broadband over Power Line Networks: Medium Access Control and Physical Layer Specifications." When completed, the project will present a standard for high speed (>100 Mbps at the physical layer) communication devices via alternating current electric power lines, so-called Broadband over Power Line (BPL) devices.

Technical Subgroup 2 (TSG2), which is dedicated to FFT and Wavelet MAC/PHY, presented thirteen revised chapters of the draft Standard on MAC/PHY layers and security.

Technical Subgroup 4 (TSG4), which is dedicated to coexistence, presented a draft annex describing the Inter-System Protocol (ISP) that enables various BPL devices and systems to share communication resources (frequency/time) when installed in a network with common electrical wiring. ISP will allow P1901-compliant devices and ITU-T G.hn-compliant devices to co-exist. The protocol provides configurable frequency division for Access and time division for in-home with a granularity compatible with the Quality of Service (QoS) requirements of the most demanding audio and video applications.

The Working Group approved TSG2's revisions by an 83% majority, and unanimously approved TSG4's ISP annex.

The technical subgroups continue to hold weekly teleconferences as they further develop the first official draft of the P1901 standard. TSG2 will also hold a face-to-face meeting during the week of 15-19 June in Fukuoka, Japan.

The Working Group will next meet 21-24 July in Tokyo, Japan. For more information, contact the Working Group chair, Jean-Philippe Faure, at jean-philippe.faure@progilon.com or visit the website at http://grouper.ieee.org/groups/1901/Meeting_Information.html.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues