Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

ITC Proposes $12 Billion Wind Power Transmission System

ITC Holdings Corp., over the past year, has worked to develop the "Green Power Express," a network of transmission lines that would facilitate the movement of 12,000 MW of power from the wind-abundant areas in the Dakotas, Minnesota and Iowa to Midwest load centers, such as Chicago, southeastern Wisconsin, Minneapolis and other states that demand clean, renewable energy. This new project addresses the recognized lack of electric transmission infrastructure needed to integrate renewable wind energy.

"We are proud to announce the Green Power Express after almost a year of studies, stakeholder discussions and development," said Joseph L. Welch, chairman, president and CEO of ITC. "The Green Power Express will create the much-needed link between the renewable energy-rich regions of the Midwest and high-demand population centers. The plan is consistent with efforts supported by organizations such as the Upper Midwest Transmission Development Initiative and promotes a national energy vision. ITC looks forward to continuing to work with them and other stakeholders in the region to move forward with this long-term solution to our national energy challenges."

The Green Power Express is just one step in ITC's broader efforts to modernize the overburdened, aging electricity grid. This project will be an integral component to ITC's efforts to create a high-voltage backbone that can meet America's renewable energy goals and eliminate costly inefficiencies in the grid.

The Green Power Express transmission project will traverse portions of North Dakota, South Dakota, Minnesota, Iowa, Wisconsin, Illinois and Indiana and will ultimately include approximately 3,000 miles of extra high-voltage (765 kV) transmission. The entire project is currently estimated to cost approximately $10 to 12 billion. Portions of the Green Power Express fall within the service territory of ITC Midwest, an ITC subsidiary. ITC has been working with many of the Upper Midwest wind developers over the last year in assembling a realistic accounting of their wind development plans and sites, which resulted in the design of the Green Power Express. As ITC continues to work with wind developers and other local utilities in the region to identify their project needs, there may be additional lines and stations identified that would effectively accumulate the available wind generation within the region.

"The Green Power Express is in many ways the true definition of a 'smart grid,'" said Welch. "According to a study by CRA International, efficient movement of up to 12,000 MW of wind power through the Green Power Express would result in a reduction of up to 34 million metric tons in carbon emissions, which is equivalent to the annual emissions of about seven to nine 600 MW coal plants, or nine to eleven million automobiles."

In support of the Green Power Express, newly created ITC limited partnership Green Power Express LP later today is filing an application with the Federal Energy Regulatory Commission (FERC) requesting approval of a revenue requirement formula and incentives for the construction of the Green Power Express including the approval of a regulatory asset for recovery of development expenses which will enable ITC to continue development efforts for the Green Power Express.

"This filing with FERC will be the first of many steps in the process to bring this project to completion to facilitate the delivery of the vast Upper Great Plains renewable wind resources to demand centers and markets in the industrial Midwest and further east," said Welch. "The Green Power Express is a portion of a bigger ITC vision of a super regional high-voltage transmission backbone."

In keeping with ITC's practice of collaboration, ITC will seek to partner with local utilities and wind developers in the region for the build out of the Green Power Express. Current supporters already include: NorthWestern Energy, NextEra Energy (formerly FPLE), Iberdrola Renewables, Generation Energy Inc., Montgomery Power Partners, Denali Energy, National Wind, Crownbutte Wind Power, Wind Capital Group and RES Americas.

"ITC and its Green Power Express are critical to meeting President Obama's goal to replace foreign imports with domestic renewable energy," said Don Furman, senior vice president for Iberdrola Renewables and president-elect of the American Wind Energy Association. "ITC's track record, as well as its independence, makes it the developer to take on this important major project."

"NorthWestern Energy looks forward to exploring potential opportunities with ITC," said Bob Rowe, CEO of NorthWestern, one of the largest providers of electricity and natural gas in the Upper Midwest and Northwest. "We are excited to be working toward providing renewable energy solutions for regions of the country in which we operate."

"A bold transmission plan is required to bring renewable wind energy from the wind rich states of the Midwest to the American consumer," said Craig Matacynski, CEO and president of RES Americas, a fully-integrated wind energy company that develops, constructs, owns and operates wind projects across the United States and Canada. "Without a bold vision, America will be hard pressed to meet our national renewable objectives."

This group supports ITC and its efforts as an independent transmission company, to bring the needed extra high-voltage facilities to this highly consistent and abundant wind-rich region of the United States.

For more information about the Green Power Express project, please visit http://www.thegreenpowerexpress.com/. Once filed, the FERC filing will be available by going to http://www.thegreenpowerexpress.com/project_filings.php.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues