Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Maine's Power Line Analysis Moves Forward

The Maine Public Service Co. and Central Maine Power Co. have reported on the preliminary conclusions of the Maine Power Connection (MPC) feasibility study. The MPC study evaluates the feasibility of connecting the Maine Public Service system to the rest of the Maine and New England electric grid and to support development of substantial wind energy resources in northern Maine.

The Maine Power Connection, a joint project of MPS and CMP, commenced with a feasibility study in March of 2007 in response to concerns over the lack of electric power competition in northern Maine. In 2006 the Maine Public Utilities Commission's standard offer solicitation attracted only one bid. Also, MPS has received connection requests to provide transmission service for more than 800 MW of proposed wind generation projects in Aroostook County. Presently, MPS does not have adequate transmission capacity to handle all of these requests.

Brent Boyles, president and CEO of Maine Public Service, said, "Based on the preliminary findings of our feasibility study, we are moving ahead with a more detailed analysis of a possible 345 kV transmission line from Limestone to the Detroit area, where it would connect to the CMP system and the New England grid. We are evaluating the use of existing transmission corridors between Houlton and Hayesville and possible new routes between the Detroit area and Chester, and between Houlton and Limestone. Also, we will continue to analyze the feasibility of a third 345 kV interconnect with eastern Canada."  

Boyles added, "The Maine Power Connection provides competitive regional electricity costs for customers in northern Maine, enhances market access for renewable energy sources, allowing up to 800 MW of wind development; improves system reliability for northern Maine, Maine and New England; reduces carbon dioxide emissions and other pollutants; enhances State and local tax bases; creates green jobs, stimulates new R&D initiatives and provides more than $1 billion in potential energy investment."

The MPC feasibility study is divided into three phases: 

  • Phase 1: Interconnect MPS territory to the New England electric grid 
  • Phase 2: Interconnect MPS, plus 800 MW proposed wind projects 
  • Phase 3: New northern Maine interconnect with eastern Canada

The study reached the following preliminary conclusions:

Phase 1

  • 138 kV interconnection would be sufficient to connect existing MPS  system with the New England grid at estimated cost of $40 million 
  • Not economically feasible if MPS ratepayers fund the project costs outweigh the potential economic benefits to MPS ratepayers

Phase 2

  • MPS currently has transmission interconnection requests for more  than 800 MW of potential wind generation projects 
  • New transmission capacity will support major wind development in  Aroostook County 
  • Connecting MPS to the New England grid with a 345 kV transmission  line will support wind generation projects and be economically  feasible with the participation of ISO-NE and its member utilities

Phase 3

  • A third Canadian interconnect merits further investigation 
  • May provide access to additional renewable energy resources

CMP and MPS expect to complete the Phase 2 feasibility study by the Summer of 2008.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues