Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Maine's Power Line Analysis Moves Forward

The Maine Public Service Co. and Central Maine Power Co. have reported on the preliminary conclusions of the Maine Power Connection (MPC) feasibility study. The MPC study evaluates the feasibility of connecting the Maine Public Service system to the rest of the Maine and New England electric grid and to support development of substantial wind energy resources in northern Maine.

The Maine Power Connection, a joint project of MPS and CMP, commenced with a feasibility study in March of 2007 in response to concerns over the lack of electric power competition in northern Maine. In 2006 the Maine Public Utilities Commission's standard offer solicitation attracted only one bid. Also, MPS has received connection requests to provide transmission service for more than 800 MW of proposed wind generation projects in Aroostook County. Presently, MPS does not have adequate transmission capacity to handle all of these requests.

Brent Boyles, president and CEO of Maine Public Service, said, "Based on the preliminary findings of our feasibility study, we are moving ahead with a more detailed analysis of a possible 345 kV transmission line from Limestone to the Detroit area, where it would connect to the CMP system and the New England grid. We are evaluating the use of existing transmission corridors between Houlton and Hayesville and possible new routes between the Detroit area and Chester, and between Houlton and Limestone. Also, we will continue to analyze the feasibility of a third 345 kV interconnect with eastern Canada."  

Boyles added, "The Maine Power Connection provides competitive regional electricity costs for customers in northern Maine, enhances market access for renewable energy sources, allowing up to 800 MW of wind development; improves system reliability for northern Maine, Maine and New England; reduces carbon dioxide emissions and other pollutants; enhances State and local tax bases; creates green jobs, stimulates new R&D initiatives and provides more than $1 billion in potential energy investment."

The MPC feasibility study is divided into three phases: 

  • Phase 1: Interconnect MPS territory to the New England electric grid 
  • Phase 2: Interconnect MPS, plus 800 MW proposed wind projects 
  • Phase 3: New northern Maine interconnect with eastern Canada

The study reached the following preliminary conclusions:

Phase 1

  • 138 kV interconnection would be sufficient to connect existing MPS  system with the New England grid at estimated cost of $40 million 
  • Not economically feasible if MPS ratepayers fund the project costs outweigh the potential economic benefits to MPS ratepayers

Phase 2

  • MPS currently has transmission interconnection requests for more  than 800 MW of potential wind generation projects 
  • New transmission capacity will support major wind development in  Aroostook County 
  • Connecting MPS to the New England grid with a 345 kV transmission  line will support wind generation projects and be economically  feasible with the participation of ISO-NE and its member utilities

Phase 3

  • A third Canadian interconnect merits further investigation 
  • May provide access to additional renewable energy resources

CMP and MPS expect to complete the Phase 2 feasibility study by the Summer of 2008.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue
  • November Issue
  • October Issue

Browse Back Issues