Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

NACEL Energy Passes Milestone for Connecting Blue Creek Texas Wind Project to Grid

NACEL Energy Corp. has announced its application for the interconnection of the first phase of the Blue Creek wind power generation project to the electric grid has now been reviewed and approved by Southwestern Public Service Co. (SPS), a subsidiary of Xcel Energy.

NACEL first submitted its plan of interconnection to SPS earlier in 2009. After considering NACEL's submission, SPS provided NACEL with a scope of work, including a detailed cost estimate of the transmission equipment and engineering resources required to accommodate the Blue Creek project. Following an internal review, NACEL then formally executed the necessary document from SPS, accepting the scope of work without revision, and additionally forwarded $135,000 for the immediate commencement of the work to be performed by SPS. SPS estimates a period of 24 weeks before all engineering and the installation and modification of equipment in conjunction with the interconnection is to be completed.

The company cautions that additional milestones remain to be undertaken and completed prior to project commissioning (operations) at Blue Creek, anticipated for the third quarter of 2010, or later depending on future events. Such milestones include the completion of the aforementioned interconnection work, obtaining a power purchase agreement and consummating turbine (debt) financing.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues