Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

North Carolina Transmission Planning Collaborative Adds 2 Projects

Participants in the North Carolina Transmission Planning Collaborative (NCTPC) have published a Supplemental Report that updates the 10-year (2007- 2017) Collaborative Transmission Plan (2007 Plan) to include two additional electric transmission system projects deemed critical for ensuring a continued reliable flow of electricity and robust transmission access in the state.

Participants include Duke Energy Carolinas, Progress Energy Carolinas, North Carolina Electric Membership Corporation and ElectriCities of North Carolina.

An ongoing assessment of needs by the transmission-operating members of the Collaborative indicated the need for the additional projects after the 2007 Plan had been submitted. The projects are needed to accommodate confirmed requests for transmission service under the Open Access Transmission Tariff (OATT) of Progress Energy Carolinas.

The 2007 Plan initially published in January 2008 included 17 major projects with a total estimated cost of $400 million. The 2007 Supplemental Plan includes 18 major projects (after adding two newly identified projects to the list and removing one in-service project from the list) with a total estimated cost of $523 million. The difference in the total estimated cost of the two plans is primarily attributable to (1) the estimated costs of $115 million for the two new major projects and (2) the revised estimated costs for some of the other Progress Energy projects included in the plan.

In addition to providing the updated plan, the Supplemental Report also discusses transmission issues associated with meeting anticipated load requirements in the Progress Energy Carolinas western N.C. region. Solutions for the western region are still under development. The 2007 Supplemental Report can be viewed on the NCTPC Web site at www.nctpc.org/nctpcunder the Reference Documents section.

The major transmission projects identified in the updated 2007- 2017 Collaborative Transmission Plan are expected to be implemented over the 10-year planning horizon by the transmission owners to preserve system reliability and supply requested transmission service. These planned projects are part of an annual planning process and are subject to change based on evolving system conditions. Work is continuing on the 2008 study and those Collaborative Transmission Plan results are expected to be published at the end of this year.

"The Commission continues to view the NCTPC process as a model for an open, collaborative regional transmission planning process that provides benefits to all North Carolina consumers," said Jim Kerr, a commissioner on the North Carolina Utilities Commission and past-president of the National Association of Regulatory Utility Commissioners (NARUC). "These positive results confirm my belief in the value of collaborative regional planning in addressing state and federal objectives."

The NCTPC was established in May 2005 to provide the Participants and other stakeholders an opportunity to participate in the electric transmission planning process for North Carolina, and to develop a single coordinated transmission plan for North Carolina electric utilities that includes reliability and enhanced transmission access considerations. Among the groups top priorities is the goal of balancing costs, benefits and risks associated with the use of transmission and generation resources.

"The completion of this Supplemental Study and the subsequent improvements in the Transmission Plan is another important milestone in the process and shows the continued benefits of collaboration," said Ed Ernst, OSC Chair.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues