Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PATH Files New Transmission Line Application in Virginia

American Electric Power and Allegheny Energy, Inc. have announced a new application has been filed for authority to build the Virginia segment of the Potomac-Appalachian Transmission Highline (PATH).

The filing with the Virginia State Corporation Commission (SCC) incorporates the latest information and analyses by regional transmission authority PJM Interconnection, L.L.C. PJM is recommending the construction of PATH by mid-2015 to address a number of serious violations of the North American Electric Reliability Corp.’s reliability standards that are projected to occur within PJM’s 15-year planning horizon, if PATH is not built.

PJM has indicated that, based on its consideration of alternatives evaluated to date, the PATH project continues to be the optimal resolution to these violations. PJM has directed Allegheny and AEP to continue with the project to resolve these reliability violations. If PATH is not built, line overloads and voltage-related issues could trigger blackouts and brownouts in the region by mid-2015. The PATH companies have incorporated the same information into their existing applications in Maryland and West Virginia.

The latest PJM analyses are consistent with previous studies recommending the construction of PATH. PJM evaluated PATH against several alternatives and found it to be the most comprehensive solution.

In May 2009, Allegheny Energy affiliate PATH Allegheny Virginia Transmission Corporation filed its original Virginia application to build the 31-mile segment in Frederick, Clarke and Loudoun counties, but was authorized by the SCC in January 2010 to withdraw its request to allow time for PJM’s comprehensive review of system needs as part of its 2010 Regional Transmission Expansion Plan process.

Affiliates of AEP and Allegheny are seeking authorization to construct a 275-mile, 765-kilovolt transmission project extending from the Amos substation in Putnam County, W.Va., to a proposed substation in Frederick County, Md.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues