Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PATH Seeks Authorization in West Virginia for New Transmission Line

American Electric Power and Allegheny Energy have announced that an application was filed seeking authorization to build a proposed electric transmission line in West Virginia.

The Potomac-Appalachian Transmission Highline (PATH) consists of a 765-kV transmission line extending nearly 280 miles from the Amos Substation in Putnam County, W.Va., to the proposed Kemptown Substation in Frederick County, Maryland. The project also includes an additional substation, Welton Spring, in northwestern Hardy County, W. Va.

The filing with the West Virginia Public Service Commission marks the beginning of the state regulatory review for the project, which is expected to last approximately one year. Similar filings for the project will occur in Maryland and Virginia within the next seven to 10 days.

PATH will strengthen the regional transmission grid and directly address concerns about the existing system’s ability to reliably deliver power to customers. PJM Interconnection, the regional grid operator directing the construction of PATH, has determined that the project is critical to addressing regional reliability concerns. PJM’s latest analysis confirms that significant reliability problems could result in blackouts and brownouts in the region, beginning in 2014, if PATH is not completed.

“The PATH project is vital to the reliability of the electricity grid serving this region,” said Michael G. Morris, AEP chairman, president and chief executive officer. “We understand the concerns about the impact of transmission lines and will work with the states and landowners to address concerns. But it is critical that we reinforce the transmission infrastructure to ensure we can continue to supply reliable electrical service 24 hours a day, 365 days a year.”

“We are committed to working closely with the public throughout this process to satisfy the region's energy needs while balancing the interests of those affected by the project,” said Paul J. Evanson, Chairman, President and Chief Executive Officer of Allegheny Energy. “We encourage the public to stay informed and support the states’ process for evaluating our proposal.”

To develop the application, the project siting team worked to identify a route that minimized PATH’s effect on all factors of the natural and human environment, while avoiding unreasonable and circuitous routes as well as extreme costs. The proposed route parallels existing transmission lines in many areas, including nearly the entire 100-mile segment between the proposed Welton Spring and Kemptown substations.

Since July 2008, the PATH project team hosted 24 public open houses across the study area, attended by more than 2,500 individuals. The sessions provided an overview of the project and gathered input from interested stakeholders. Throughout the process, the routing team reviewed nearly 3,000 written comments as well as mark-ups identifying homes and other landmarks through field inspections and detailed aerial photography.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues