Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PECO Conducting Aerial Line Inspections to Ensure Continued Reliability

PECO, Philadelphia, Pennsylvania, is conducting helicopter inspections of its transmission lines as an important part of the utility's regular program to ensure safe and reliable electric service to homes and businesses throughout the area.

The company has contracted Haverfield Airship, a provider of aerial power line inspection and maintenance services to the electric power industry, to perform infrared and visual inspection of more than 1000 miles of transmission lines in PECO's six county service territory. The infrared equipment detects portions of the lines that may need to be repaired or replaced, while visual inspections of other aerial equipment like conductors and transmission towers identify potential damage due to weather, such as high winds or lightening strikes. There are no outages or customer impacts associated with the inspections.

During the next few weeks, a helicopter will fly approximately 12 to 20 feet above transmission lines and structures to perform the inspections.

"Like the rest of our electric system, transmission lines are exposed to weather-related elements all year long," said Craig Adams, PECO chief operating officer. "Extreme temperatures, high wind, and lightening can have an effect on conductors, switches, clamps, and other equipment. Conducting these inspections helps ensure we can fix these problems before they cause a power outage."

PECO owns approximately 1,035 miles of above ground transmission line in Bucks, Chester, Delaware, Montgomery, and Philadelphia counties. The company conducts helicopter inspections of all of its transmission lines annually.

Most of PECO's transmission right of ways are in the suburban counties connecting the region's power plants to local substations, and connecting substation to substation for increased reliability.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues