Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

PHI's Proposed Interstate Transmission Line Backed

Pepco Holdings Inc.'s proposal to build a 230-mile interstate power line to enhance electric reliability in one of the most transmission-congested regions of the country was recommended for construction today by the staff of PJM Interconnection, the independent operator of the mid-Atlantic power grid.

The staff's recommendation is a key step in the process leading to final consideration by PJM's Board of Managers in October. The board's approval to include the high-voltage line in its regional transmission expansion plan would allow PHI to begin an extensive multi-state permitting and environmental review process that must be completed prior to construction.

The 500-kV line, designated as the Mid-Atlantic Power Pathway (MAPP), would connect northern Virginia to New Jersey through Maryland and the Delmarva Peninsula, providing PHI's 1.9 million customers access to more affordable power-generation sources. Most of the line will be sited within or adjacent to existing transmission right-of-way.

"We must expand our ability to transport power now if we want to meet the rising electricity demands that threaten to overwhelm our system in the future without these upgrades," said William Gausman, PHI vice president and MAPP project manager. "During the recent heat wave, transmission lines in the Baltimore-Washington corridor, throughout the Delmarva Peninsula and into Southern New Jersey approached their limits as customer usage peaked. Today we can handle this kind of demand; we want to build this line to make sure we can continue to meet our customers' needs 10 years from now."

Gausman said customer demand for power during peak usage times in PHI's four-state service area alone is projected to increase by nearly 20 percent over the next decade. "Only through a combination of energy conservation, environmentally responsible new generation and a more robust transmission system can we avoid blackouts that federal energy regulators predict could affect this area within several years," he added.

No major interstate transmission line has been built in the mid-Atlantic region in the last 25 years despite significant growth of the population and an economy that produces 18 percent of America's Gross National Product.

In 2006, the U.S. Department of Energy identified Southern California and the region from New York to northern Virginia as the two most constricted transmission areas in the country. The Department described the regions urgent need for new transmission and generating facilities, and additional energy conservation measures "to protect grid reliability and ensure the area's economic vitality."

The MAPP line is expected to cost $1.05 billion and would be built in stages over several years. PHI would add significant 230-kV support lines on the Delmarva Peninsula and in southern New Jersey to connect with the new 500-kV line, bringing the total cost to $1.2 billion. The 230-kV lines are still being evaluated by PJM, which operates the regional transmission system in 13 states and the District of Columbia.

The MAPP is designed as a high-voltage, backbone transmission system that will enhance reliability and increase access to renewable and other diverse, less expensive generation resources during periods of high consumption. Congestion on the existing transmission system limits access to more distant and economic electricity during these periods, forcing reliance on much higher-cost generation sources located close to large population centers. Studies show MAPP will reduce congestion charges that now cost retail customers tens of millions of dollars annually in PJM's eastern region.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues