Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PHI Requests Procedural Delay for MAPP Project

Pepco Holdings, Inc. has asked Maryland regulators to suspend until June 2010 the procedural schedule on its application to build a high-voltage transmission line to the Delmarva Peninsula, pending completion of a review at that time of the Mid-Atlantic region’s over-all transmission needs by PJM Interconnection, the independent regional power grid operator.

In a letter to the Maryland Public Service Commission, PHI said that “because of a significant change in circumstances” involving another proposed high-voltage transmission line in Virginia, “it is both prudent and efficient” to suspend the procedural schedule while awaiting completion of the new study. The company asked that a revised schedule then be established in June.

PHI, the corporate parent of Delmarva Power, has proposed to build the Mid-Atlantic Power Pathway (MAPP), a 150-mile, 500-kV transmission line from Virginia, through Maryland and across the Chesapeake Bay. It would provide the Delmarva Peninsula with a strong backbone transmission system with a second link to additional energy sources, relieve higher energy costs resulting from congested high-voltage lines, and resolve current and future reliability issues facing the region.

PJM, which manages the grid system for a 13-state region and the District of Columbia, has scheduled an in-service date of 2014 for MAPP. However, the studies PJM had conducted for MAPP all relied on an assumption that the new Virginia line also would be in service at that time.

Last week, PJM indicated that certain preliminary studies based on new assumptions suggest that the Virginia line may not be needed as soon as originally predicted, but made no assessment of MAPP.

PHI believes that the overall need for MAPP remains in order to serve long-term energy demand and provide electric reliability. The company will continue with its design, environmental studies and route definition process for MAPP while awaiting the new PJM study results.

PHI remains committed to constructing a regional, reliable transmission system and has asked the Maryland commission to establish a revised procedural schedule for the proceedings in June.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues