Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PJM Reinforces MAPP Need; Adds Year to Schedule

Pepco Holdings Inc. has reported that a review by the regional power grid operator has determined that the company's planned Mid-Atlantic Power Pathway (MAPP) transmission line remains critical to long-term electrical reliability in southern Maryland and on the Delmarva Peninsula. However, a one-year delay was recommended for the line's in-service date due to a reduced, near-term load forecast for the region.

The grid operator, PJM Interconnection, recommended moving the in-service date for MAPP from 2013 to June 1, 2014. The downturn in the economy and resulting reduction in power demand was factored into its recommendation. PJM projects future electricity demand will increase as the economy recovers and said that MAPP is essential to maintaining long-term electric reliability.

"The MAPP project continues to be a critical part of the solution in addressing future energy demand in southern Maryland, on the Delmarva Peninsula and throughout the Mid-Atlantic region," said William M. Gausman, PHI Senior Vice President for Asset Management and Planning. "It takes years to finalize approvals and construct major infrastructure projects like this line. Because of the long-lead time for completion, we do not anticipate this decision to significantly affect our ongoing efforts to responsibly move forward with the critical activities, including the regulatory and permitting process for MAPP."

According to Gausman, PJM has also reviewed the need for the section of the line that would run from Delmarva Power's Indian River substation near Millsboro, Del., to Salem, N.J., and has decided to move this portion of the line into its "continuing study" category. This means that the reconfigured MAPP line will now extend approximately 150 miles from northern Virginia, across southern Maryland and the Chesapeake Bay, and terminate at Indian River. The change would likely reduce the total project cost from $1.4 billion to $1.2 billion.

The use of an advanced high-voltage direct-current system for a portion of the MAPP project is an important reason that the line will still be able to address expected electricity reliability violations on the Delmarva Peninsula and the Mid-Atlantic region. This direct-current line will connect to the existing transmission system that has undergone extensive upgrades over the past few years. Gausman said that the northern portion of MAPP could be reinstated at any time based on future PJM analysis.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues