Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

PJM Authorizes Construction of $2.9 Billion in Transmission Additions and Upgrades

The PJM Interconnection Board has authorized $2.9 billion in electric transmission upgrades and additions, including two major new transmission lines. The authorization came with the Board's approval of changes to PJM's Regional Transmission Expansion Plan, which maintains the reliability of the power supply system serving 51 million people in 13 states and the District of Columbia.

As part of the plan, one line would run approximately 300 miles from the Amos Substation in western West Virginia to the Kemptown Substation in north central Maryland. The line would be built as a 765-kV line for most of its length. It is estimated to cost $1.8 billion.

A second line would run approximately 130 miles from the Susquehanna Substation in northeastern Pennsylvania to the Roseland Substation in northern New Jersey. It would be a 500-kV line and is estimated to cost $930 million.

"Regional transmission organizations such as PJM are building the transmission infrastructure America needs to maintain both the reliability and efficiency of the national power supply system," said Phillip G. Harris, PJM president and chief executive officer. "While these two new lines are required to maintain the grid's reliability, they have the secondary benefit of resolving about $450 million in annual congestion costs."

The Amos to Kempton line will relieve overloads that will occur as early as 2012 on 13 existing transmission lines in Maryland, Pennsylvania, Virginia and West Virginia. Overloads threaten the system's ability to keep power flowing to consumers. The new line will be built by American Electric Power and Allegheny Energy.

The Susquehanna to Roseland line addresses overloads projected to occur as soon as 2013 on 23 existing transmission lines in New Jersey and Pennsylvania. The new line will be built by PPL Corporation, FirstEnergy Corp. and Public Service Electric and Gas Company.

The utilities building the transmission lines will determine the routes that the lines will follow subject to government approval. PJM does not set the routes.

PJM has authorized more than $7 billion of accumulated transmission investment since its planning process began seven years ago. Through the planning process, 19,465 megawatts of new generation have been interconnected with 4,772 megawatts of generation now under construction.

A number of other transmission additions remain under evaluation. They include a transmission line proposal announced early last year by Pepco Holdings Inc. PJM has been working with Pepco to review the proposed line. Evaluation of a recent transmission line proposal by Public Service Electric and Gas Company will begin.

PJM's Regional Transmission Expansion Plan includes upgrades and new projects to maintain system reliability and to interconnect new electric generation. PJM has a 15-year planning horizon. The plan considers the growth and changes in the broad, multi-state region. By not being limited to considering just one utility's service territory, the PJM planning process can determine the most effective and cost-efficient transmission solution no matter where it is located in the region.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

News Releases

Amy Fischbach

The Briefing Room


Amy Fischbach

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue

Browse Back Issues