Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PJM Authorizes Construction of $2.9 Billion in Transmission Additions and Upgrades

The PJM Interconnection Board has authorized $2.9 billion in electric transmission upgrades and additions, including two major new transmission lines. The authorization came with the Board's approval of changes to PJM's Regional Transmission Expansion Plan, which maintains the reliability of the power supply system serving 51 million people in 13 states and the District of Columbia.

As part of the plan, one line would run approximately 300 miles from the Amos Substation in western West Virginia to the Kemptown Substation in north central Maryland. The line would be built as a 765-kV line for most of its length. It is estimated to cost $1.8 billion.

A second line would run approximately 130 miles from the Susquehanna Substation in northeastern Pennsylvania to the Roseland Substation in northern New Jersey. It would be a 500-kV line and is estimated to cost $930 million.

"Regional transmission organizations such as PJM are building the transmission infrastructure America needs to maintain both the reliability and efficiency of the national power supply system," said Phillip G. Harris, PJM president and chief executive officer. "While these two new lines are required to maintain the grid's reliability, they have the secondary benefit of resolving about $450 million in annual congestion costs."

The Amos to Kempton line will relieve overloads that will occur as early as 2012 on 13 existing transmission lines in Maryland, Pennsylvania, Virginia and West Virginia. Overloads threaten the system's ability to keep power flowing to consumers. The new line will be built by American Electric Power and Allegheny Energy.

The Susquehanna to Roseland line addresses overloads projected to occur as soon as 2013 on 23 existing transmission lines in New Jersey and Pennsylvania. The new line will be built by PPL Corporation, FirstEnergy Corp. and Public Service Electric and Gas Company.

The utilities building the transmission lines will determine the routes that the lines will follow subject to government approval. PJM does not set the routes.

PJM has authorized more than $7 billion of accumulated transmission investment since its planning process began seven years ago. Through the planning process, 19,465 megawatts of new generation have been interconnected with 4,772 megawatts of generation now under construction.

A number of other transmission additions remain under evaluation. They include a transmission line proposal announced early last year by Pepco Holdings Inc. PJM has been working with Pepco to review the proposed line. Evaluation of a recent transmission line proposal by Public Service Electric and Gas Company will begin.

PJM's Regional Transmission Expansion Plan includes upgrades and new projects to maintain system reliability and to interconnect new electric generation. PJM has a 15-year planning horizon. The plan considers the growth and changes in the broad, multi-state region. By not being limited to considering just one utility's service territory, the PJM planning process can determine the most effective and cost-efficient transmission solution no matter where it is located in the region.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues