Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AREVA to Build De-Icing and Power-Quality System

AREVA's T&D division (Paris, France) has been awarded a 25-million euro contract in Canada to build the world's first high-voltage direct current (HVDC)-based de-icing and power-quality system. The turnkey contract is with Hydro-Québec, the state-owned utility in the Canadian province of Quebec. Hydro-Québec's power network contains 32,000 miles (51,500 km) of transmission lines, includes more than 500 high-voltage substations and is connected to 15 power grids located outside the province.

To optimize the security of its power grid, Hydro-Québec has contracted AREVA T&D to build and install HVDCice, a transmission line de-icing system based on HVDC technology. During ice storms that struck Quebec in 1998, hundreds of kilometers of high-voltage transmission lines and thousands of transmission towers collapsed from an accumulation of ice, leaving millions without electricity. AREVA's HVDCice will generate up to 7200 A of direct current in the transmission lines, increasing their temperature so that ice melts and falls off.

The HVDCice system will be implemented at the Lévis Substation, a major connection point for the transmission lines of the province. At the heart of the HVDCice will be AREVA's latest thyristor valve, currently being implemented in the Konti-Skan HVDC project that is linking the power systems of Denmark and Sweden. When not in use for de-icing purposes, the HVDCice system will act as a static VAR compensator (SVARC). The SVARC will stabilize the voltage on the 735-kV power grid, which fluctuates depending on the amount of electricity being consumed.

AREVA T&D will work closely with the engineering and construction company SNC-Lavalin (Montreal, Québec), who will supervise the civil works, coordinate with the subcontractors and carry out engineering studies. AREVA's system, which will cover approximately 600 km (323 miles) of transmission lines, will be operational by the fall of 2006.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues