Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Call for Participation: Utilities Seek More Capacity from Existing Right of Way

Today, power lines are often operated at their limits while utilities continue to face delays in installing new facilities. Thermal limits occur when the maximum allowable conductor sag is reached. Previously, expensive line reconstruction or reconductoring was required to address this problem.

The Electric Power Research Institute (EPRI; Palo Alto, California, U.S.) now proposes field trials of a device that can reduce excessive line sag. The in-line device, SliM (Sagging Line Mitigator), reacts to increasing conductor temperature by decreasing the effective length of the conductor in the span, mitigating the natural thermal expansion experienced by the conductor during high-temperature operation. The device is the result of a three-year R&D program by Material Integrity Solutions Inc. (Berkeley, California), sponsored by the California Energy Commission.

Tests performed in July 2002 at a Pacific Gas & Electric lab in Livermore, California, demonstrate the functionality of the device. Two 500-ft (152-m) spans of 795 kcmil ACSR conductor at 5000 lbs (22,241 newtons) initial tension at 90°F (32°C) temperature were subjected to a current of 1200 amperes. The sag differential between the control span and the span treated with a SLiM device was about 4 ft (1.2 m) at a 210°F (99°C) conductor temperature. These early positive results have provided EPRI with the incentive to seek participants for field tests.

Utilities showing an interest include Arizona Public Service, British Columbia Hydro, National Grid, Excelon and Electricité de France. Additional utilities who wish to join this initiative can contact Dr. Ram Adapa at (650) 855-8988 or via e-mail at radapa@epri.com.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues