Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Hydro and Ohio Brass Solve Transmission Lightning Problem

Newfoundland and Labrador Hydro (Hydro) is a Crown Corporation that provides electricity to residents, business and industrial customers in Newfoundland and Labrador, Canada. Two of the 230-kV lines critical to the grid supplying the province are on the same right-of-way, spaced about 40 m (130 ft) apart, on guyed-V steel structures. The protective relaying scheme for the lines is single-pole, high-speed reclose if one phase trips because of a lightning strike. The basic intent of the line design and relay protection is to always have one line in service during lightning storms. If these lines go out at the same time, half the province loses power.

These 230-kV lines were originally designed and built in the 1960s with no overhead shield wire. But beginning in 1980, there were occasional two-line tripouts. During one storm in 1998, both lines went out and then back in about four times, a situation that was just not acceptable. From 1980 to 2000, Hydro tried to solve this issue with several approaches, including grounding improvement, but two-line outages persisted. After the 1998 experience, Hydro studied the idea of adding overhead shield wires, but found it not economically feasible. Fortunately, the technology of line surge arresters became available about this time. After studying it, Hydro decided to use 230-kV line arresters on one of the lines.

SOLUTION AND INSTALLATION

Hydro was concerned about adding line arresters to the structures because of the extra weight of the arresters, especially in high winds or icing conditions. Three arresters were to be suspended at every structure; this had not been done before. Nevertheless, Hydro created a request for proposal and solicited bids. The successful bidder was Hubbell/Ohio Brass through their distributor Harris & Roome, Division of Graybar Canada.

The Protecta*Lite line arresters with 60-mm (2.4 inches) metal-oxide-varistor blocks were selected. This size block was chosen based on an outage rate study conducted by Power Technology Inc., who studied expected outage rates for different size blocks, different lightning intensities and grounding. The goal was to keep double-line outages to a one in 30-year probability.

Cost was also a factor in bid evaluation, as well as warranty. Hubbell was excellent on both counts. In addition, Hubbell offered a team approach: to take ownership of the project and work with Hydro in case it had problems after the arresters were installed. This support proved important as time passed.

The arresters were installed on the 141-km (88-mile) line in two phases: Phase 1 was from April to May 2000, and Phase 2 from February to March 2001. J&J Line Construction, a local line contractor, installed 1089 arresters on 363 structures. On each structure, J&J hung one arrester on each outside phase and one from the center phase.

While there were initially concerns about delivery, Harris & Roome tightly coordinated delivery of the arresters with installation progress and there was no problem. At no time was the contractor delayed because of arrester delivery.

NEW PROBLEMS AND A NEW SOLUTION

Problems developed with some of the copper ground wires from the bottom of the arrester insulator string to the tower on some phases. Following heavy winds, the wire was catching on tower bolts. When the wind blew across the line, one of the arresters would swing toward the tower and the ground wire would become hooked on the bolts of the tower. When the wind subsided and the line swung back out, the ground wire remained hooked, leaving a shortened wire. Over time the wires would wear and break off. Several solutions were attempted including adding extra weight to the bottom of each arrester. In addition, a length of rubber hose was added to the end of the wires. But over time, the rubber broke down from both the ultraviolet sunlight and wear. The ground wires still got hooked on the towers and nothing seemed to work. At this point, Hydro discussed the problem with Ohio Brass engineers in Wadsworth, Ohio, U.S.

As a final solution, Ohio Brass suggested weaving the ground wire through a 4-m (13-ft) length of chain running from the bottom of the arrester to the tower. After review of this design with Hubbell in Wadsworth in December 2002, Hydro decided to use the chain as the permanent solution. Ohio Brass supplied the materials and the cost of transportation to Newfoundland and Labrador, and Hydro installed the new ground wires with the chains. Using Hydro operations crews and taking planned outages on the line, the old ground wires were removed and the new wires, already woven through the chain, were installed. Because of limited access to the line, crews were flown in by helicopter.

SUCCESS WITH NO OUTAGES

The new ground wires were installed in 2003 and there have been no problems since then. Hydro has flown the line and hasn't experienced any outages from a mechanical point of view. Electrically, it's also been a winner. The line has performed very well, and there have been no lightning outages or any arrester-associated problems since installation. Most importantly, no two-line outages have occurred.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues