Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

India Optimizes Capacity with HVDC

The Siemens Power Transmission and Distribution Group (PTD; Erlangen, Germany) has been awarded an order by the Powergrid Corporation of India (PGCIL; New Delhi, India) to increase the capacity of the East-South long-distance high-voltage direct current transmission (HVDC) link in India.

Since 2003, the Siemens system has been transporting electrical power with low loss from the Talcher power plant complex in the state of Orissa in eastern India, located 1450 km (900 miles) to the south, to the industrial region around Bangalore. Presently, the system is designed for transmission of 2000 MW. After the upgrade is completed, it will be possible to make maximum use of the system's overload capacity of up to 2500 MW. In this way, power supplier PGCIL is catering to the growing demand for energy in the region around Bangalore. The order has a value of about 14 million euros and the project will run for 15 months.

To increase the capacity of the East-South link, the Siemens experts have developed a solution not usually used for HVDC systems. With the aid of a system known as Relative Aging Indication and Load Factor Limitation (RAI&LFL), it will be possible to use the overload capacity of the system more effectively without the need to install additional thyristors connected in series or in parallel to increase the dc transmission capacity.

Part one of the system, RAI, models the thermal characteristics of the power converter transformers and the smoothing reactors to ensure that the planned service life of the system at rated load is still attainable despite the increase in power. The aging curve of the transformers and the reactors is calculated on the basis of the modeling. Part two, LFL, computes the maximum possible load taking into account the oil temperature and ambient temperature and the availability of the cooling units. This allows power transmission of between 2000 MW and 2500 MW at a dc transmission voltage of ±500 kV for a substantially prolonged period due to the more efficient use of the overload characteristics of the HVDC system.

In addition to the RAI&LFL system, Siemens is also retrofitting several components to increase the performance of the system. These include new cooling units for the power converter transformers at both stations to dissipate more heat. Also included is forced cooling of the smoothing reactors for greater current carrying capacity and additional ac filter banks to cover increased reactive power. Further, new reactors for PLC filters, circuit breakers for the new ac filter banks, arresters and current transformers will also be installed. The open and closed-loop control concept and the protection concept will be adapted to the new operating mode of the HVDC transmission system as part of the upgrade, and the system's own auxiliary power supply will be augmented.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues