Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

A New Dimension of HVDC Technology: Siemens Constructs HVDC Link in China, Taking Power Capacity to New Heights

China Southern Power Grid Co. (Guangzhou, China) has awarded Siemens Power Transmission and Distribution (PTD; Erlangen, Germany) an 300 million euro order to construct a high-voltage dc transmission (HVDC) system between the province of Yunnan in the southwest corner of China and the province of Guangdong on the south coast of the country. The system will be the first in the world to transmit electricity at a dc voltage of ±800 kV. At the same time, this project, with a power-transmission capacity of 5000 MW, will be the long-distance HVDC link with the world's highest-ever power capacity that has been built. The system is scheduled to commence commercial service by mid-2010.

The additional electric power from Yunnan will supply the rapidly growing industrial region of the Pearl River delta in the province of Guangdong and the megacities of Guangzhou and Shenzhen. In the future, the electricity generated by several hydro-electric power plants will be transported from Yunnan via 1400 km (870 miles) to Guangzhou over this long-distance HVDC link. The economically and environmentally friendly hydro-electric power generation does not emit any CO2; therefore, it will save the emission of more than 30 million tons of CO2 a year (which is the amount of harmful gas that would be produced through the construction of additional fossil-fired conventional power plants in the province of Guangdong to serve the regional grid).

“This outstanding order shows that our efforts over recent years to further develop 800-kV HVDC technology to the point where it is ready for use in projects have been worthwhile. Today, we can boundlessly provide it to our customers,” says Dr. Udo Niehage, president of Siemens PTD.

Together with Chinese partners, Siemens designs the HVDC system, including ten 800-kV and ten 600-kV converter transformers, dc filters and 800-kV dc components. Siemens also supports its Chinese partners in design and manufacturing of thyristor valves, converter transformers and control systems. The converter stations operate in bipolar mode with two series-connected 12-pulse valve groups per pole, in which light-triggered thyristors are used. This scheme improves the reliability and flexibility of the power transmission.

The steep rise in demand for power in China's industrial centers requires huge amounts of electricity to be conveyed over distances of 1000 km (621 miles) and more. HVDC transmission is the only expedient method, in terms of both technology and efficiency, and it is the only technically and economically viable solution. As the current Siemens HVDC project shows, China has now increased the dc transmission voltage of new long-distance HVDC systems to ±800 kV, in response to China's need for even longer lines and more bulk transmission demand. China is the fastest-growing market in the field of power transmission and distribution, and will become the world's largest single market for HVDC transmission technology over the next 20 to 30 years.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues