Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

United States: BPA Power Line Completed Just in Time to Keep Lights On

The Bonneville Power Administration (BPA; Portland, Oregon) reports that it strengthened a weak link in the Puget Sound area's electrical transmission grid just in time to meet record high demand during the arctic cold front now engulfing the region.

“After years of planning and a tight construction schedule this fall, the Kangley-Echo Lake line went into full operation on December 31,” said Vickie VanZandt, BPA's chief engineer. “We got it into service just in time to meet record-high loads driven by the current arctic cold front.”

VanZandt said growth in the Puget Sound area has increased demand on the transmission system and necessitated upgrades. The Kangley-Echo Lake line stretches 9 miles (14 km) through the Cedar River Watershed. It is a vital connection needed to ensure the reliable flow of power from generating plants east of the Cascades into Seattle and population centers to the north.

The Northwest Power Pool reported regionwide peak usage of more than 54,700 MW on Jan 6, 2004. Forecasters expect record high consumption as population centers along the I-5 corridor and east of the Cascades absorb the full brunt of the arctic express.

“We don't expect any trouble meeting loads from a generating standpoint,” VanZandt said. “But in weather like this, having a strong delivery system is equally important.”

The Kangley-Echo Lake line cost US$40 million to build. BPA used state-of-art environmental techniques to construct the line through the Cedar River Watershed, thereby protecting the source of Seattle's drinking water.

“We worked in close partnership with the city of Seattle to construct this line and will continue to work with them on future maintenance activities to ensure protection of the Cedar River Watershed,” said Lou Driessen, Kangley-Echo Lake project manager.

This represents BPA's latest investment in reinforcing the power delivery system into the Puget Sound region.
Circle 152 on Reader Service Card or visit freeproductinfo.net/td

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues