Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

PPL Electric Utilities Selects Route for New Regional Power Line

After an exhaustive study process that included 10 public input workshops throughout the region and numerous discussions with residents, elected officials and others, PPL Electric Utilities has chosen Route B as the route for the Susquehanna-Roseland power line project in Pennsylvania.

The selected route runs north from Berwick, Pennsylvania, past Wilkes-Barre and Scranton, then east to Hawley and southeast to Bushkill where it crosses the Delaware River. It follows existing power lines for almost its entire distance.

The New Jersey portion of the power line, from the river to Roseland, New Jersey, will be built by Public Service Electric & Gas Co.

"Two of our main goals were to minimize the impact of this project on residents near the line, and on the environment," said David E. Schleicher, vice president - Transmission. "We are convinced that this is the best route to accomplish those goals while providing very real reliability benefits for electric customers in eastern Pennsylvania and throughout the region."

The 500-kV power line is needed to handle increasing customer demand for electricity that could otherwise lead to overloads and even blackouts on the regional power grid. Because overloads can have widespread regional effects, the line will benefit all electric customers in the region, regardless of where they live or which electric company serves their needs, Schleicher said.

He pointed out that the regional blackout of 2003 -- which started with power line failures in Ohio -- spread as far as New York City, leaving nearly 50 million people without electricity. "The regional electricity transmission system is only as strong as its weakest link," Schleicher said.

The PJM Interconnection, which oversees reliability planning for the regional power grid, identified the need for the new line and assigned PPL Electric Utilities to build the Pennsylvania portion.

PJM determined that if this upgrade is not made by May 2012, there is the potential for overloads on other power lines. The danger is greatest during periods when demand is highest -- the hottest summer days and the coldest winter nights.

Because this type of power line provides regional benefits, its cost is shared by all electric customers in PJM, a region of 51 million people encompassing 13 states and the District of Columbia.

"We understand that new power lines -- even if they are built where existing lines now stand -- can cause concern for nearby residents," Schleicher said. "We will work very hard with individual property owners to answer their questions and address their concerns about this project as we move forward."

PPL Electric Utilities evaluated three possible routes for the line. Two of the possible routes went north through Luzerne, Lackawanna, Wayne and Pike counties. The third possible route went south through Schuylkill, Lehigh and Northampton counties.

The decision to choose Route B was made after careful consideration of impacts along all three routes, and after considering public input. PPL Electric Utilities received extensive comments from interested people along all three routes, including comments made in person at public input workshops, by phone using a special toll-free number, and by e-mail from the project's Web site.

The company will ask the Pennsylvania Public Utility Commission to approve the route in an application that is expected to be filed in the fourth quarter of 2008. The PUC review process, which also includes input from the public, could take as long as a year. The line is scheduled to be in service by May 2012.

Construction of the line will provide an economic boost to the region of at least $100 million over three years, creating 165 to 330 construction jobs during that period, according to an economic impact study conducted by the Penn State Workforce Education and Development Initiative Team.

"This project will help ensure that PPL Electric Utilities can continue its long-standing record of providing excellent and reliable electric service to our customers in Pennsylvania, while supporting continued electric service reliability for all electric customers across the region," Schleicher said.


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues