Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Prairie Wind Transmission to Build New, High-Capacity Transmission Line

Prairie Wind Transmission, LLC, a joint venture between Westar Energy and Electric Transmission America, filed its siting permit application with the Kansas Corporation Commission yesterday to request permission to build a new, double circuit 345 kV transmission line. The line would go from Westar Energy's Wichita 345 kV substation, about one mile northeast of Colwich, to a new substation just east of Medicine Lodge, Kansas, and then south to the Kansas-Oklahoma border. Oklahoma Gas and Electric (OGE) will continue the line from the Kansas-Oklahoma border to its Woodward Substation, about 10 miles south of Woodward, Oklahoma.

The project is part of the Y-Plan that the Southwest Power Pool approved last year. This high-capacity transmission line will improve the regional electric grid by better integrating the east and west regions and facilitating the addition of renewable generation to the electric grid.

Late last year and early this year, Prairie Wind Transmission conducted six open houses to exchange information with landowners near several routes being considered for the transmission line. About 294 completed questionnaires were received from landowners and area residents who attended open houses or contacted Prairie Wind Transmission regarding the line.

"We encourage landowners to be a part of the process, and the open houses and questionnaires promote that by bringing landowners into the conversation and giving them the opportunity to provide valuable input," said Kelly Harrison, Prairie Wind Transmission president.

Prairie Wind Transmission enlisted the services of an outside engineering firm to perform a routing study and analyze the feedback received from the open houses. The results of this analysis were used to complete a comprehensive summary of all the route segments that were being considered for this line and ultimately led to the selection of a preferred route. Landowners generally indicated they preferred a route that would minimize the proximity to residences, maintain reliable electric service, minimize length across tilled agricultural land, maximize the distance from public facilities, and maximize the distance from businesses.

With the KCC's approval expected in late June 2011, Prairie Wind transmission will begin working with landowners to acquire easements in the July-August 2011 time frame. Once easements have been acquired, construction is estimated to begin in the summer of 2012. The company anticipates the project will be complete at the end of 2014. Prairie Wind currently estimates that it will cost about $225 million to construct the proposed line.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues