Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PSE to Rebuild Electric Transmission Lines in Ebey Slough Basin

Puget Sound Energy (PSE) has began preliminary construction work to replace 2.5 miles of two high-voltage electric transmission lines in Snohomish Countys Ebey Slough basin in Washington state. The $15 million project will replace decades old 115 kV and 230 kV transmission lines and structures, and help increase the safety and reliability of the regional high-voltage electric transmission system.

Currently, PSEs existing power lines in the basin are supported by wooden H-frame poles, which are not designed for use in the standing tidal water that is now there. Over time, environmental conditions have deteriorated the frames and, in some cases, the anchors and guy wires supporting them have pulled out of the soft, saturated soils.

Replacing the existing deteriorating wooden structures in Ebey Slough basin with steel poles that can withstand the changing environmental conditions of the basin is a necessary upgrade to the PSE infrastructure, said Sue McLain, senior vice president of Operations at PSE. Not only will replacing the unstable frames with sturdy poles and stringing new wire enhance the safety and reliability of our regions transmission system, it will also protect the fragile surrounding wetland habitat from potential damage in the future.

We worked long and hard to keep everyone involved in the process to find the best solution to replace the lines and obtain all of the necessary permits, McLain added. We thank the community and permitting jurisdictions for their cooperation then and now as we work in a short six-month environmental window to complete the job before the next storm season.

This months preliminary work has PSE placing erosion and sedimentation control silt fences and silt curtains in work areas to prevent erosion. The company will then install foundations at each end of the project at Fobes Road and near Home Acres Road, and install two conventional pier foundations near Home Acres Road. PSE will use Marsh buggies, lightweight amphibious tracked vehicles designed to have less impact on wetlands than conventional vehicles, to minimize impacts on the surrounding environment.

Beginning the week of June 2, PSE is scheduled to start constructing 11 micropile foundations (unique, deep foundations appropriate for wetland areas). PSE will then:

  • Begin verification testing of micropiles, and
  • Complete installing micropile foundations near the cross dike and continue working to the south throughout June, July and August.

Beginning in mid- to late-August, PSE is scheduled to:

  • Begin work on the approved wetland migration site north of the remnant dike area along Fobes Road and re-route the mouth of Moser Creek. This work is designed to enhance fish habitat and salmon passage in the creek.

In September, PSE is scheduled to:

  • Use a sky crane helicopter to install 15 steel poles on the conventional and micropile foundations.

From mid-September through early November, PSE is scheduled to:

  • String wire on the newly installed steel poles, and
  • Use two smaller helicopters to remove the existing 84 wooden poles and wires.

Construction is scheduled to be complete in November.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues