Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

Pennsylvania Governor Voices Concerns over Proposed Electric Tranmission Corridor

If the U.S. Department of Energy is allowed to designate a large area of Pennsylvania and the Northeast United States for transmission lines, a Pennsylvania Governor Rendell administration official said such a move would possibly supplant states’ rights and could lead to the construction of unnecessary power lines. Daniel Griffiths, director of Pennsylvania's Bureau of Energy Innovations and Technology Deployment, testified before the Department of Energy Wednesday about its proposed Mid-Atlantic Area National Corridor.

“The Department of Energy's broad designation of the Mid-Atlantic Corridor, which includes much of Pennsylvania, combined with the siting process recently adopted by the Federal Energy Regulatory Commission may lead to projects in Pennsylvania that ignore the nation's best interests and the critical concerns of states,” said Griffiths, who spoke on behalf of Governor Edward G. Rendell. “Governor Rendell fears the breadth of this corridor—as outlined by the federal government—may lead to projects that harm Pennsylvania without any balance of benefits. Also, the Federal Energy Regulatory Commission’s ability to disregard a state's evaluation of a proposed project undermines the notion of states' rights and may force Pennsylvania and others to accept projects that are far from the best choice.

“We urge the Department of Energy to withdraw its designation and postpone any decision until it is clear that states are unable to site necessary transmission facilities or identify reasonable alternatives,” Griffiths said.

Griffith's testimony followed a letter by Governor Rendell to Energy Department Secretary Samuel W. Bodman, which stated similar concerns.

In the letter dated June 8, Governor Rendell said the Mid-Atlantic Area National Corridor, as outlined by the Department of Energy, is so expansive that it is meaningless. The Governor argued that if the Department of Energy must designate such areas to protect the reliability of transmission capacity and the country's best interests, it should have identified specific needs and routes necessary to meet those demands.

Governor Rendell also voiced his concern that because such a vast portion of Pennsylvania's geography has been designated as potential sites serving the nation's best interest, the commonwealth may be forced to accept projects that serve the other states more so than the Keystone State.

 “Pennsylvania and other states face the possibility that transmission lines can be located almost anywhere and qualify for designation by the Federal Energy Regulatory Commission,” Griffiths said. “Can a corridor that includes 50 of our 67 counties realistically be related to actual transmission options? And, because we cannot recall an instance when the Pennsylvania Public Utility Commission has denied a power line application, we must ask why the need for this authority?

“Transmission lines could be built on our soil and not benefit our residents,” Griffiths said. “The commonwealth has worked aggressively over the last four-and-a-half years to expand its clean and renewable energy production industries,” said Griffiths. “These investments have created 2500 new jobs, attracted nearly a billion dollars in new investment to the state and have moved us towards an energy independent future. We are concerned that many of the proposed transmission lines bypass parts of our state where clean, new generation is coming online and, instead, pulls power from old, dirty plants to the east and south of us. Those lines are a ‘loss’ for Pennsylvania’s economy and environment.”

In the letter to Secretary Bodman, Governor Rendell also asked if the Federal Energy Regulatory Commission would adequately consider alternative technologies and routes--something the commission's final order does not seem to address, according to Rendell. While noting a section of the final order, paragraph 179, the Governor said the language suggests that a proposed project alone can define FERC's scope of review, in other words, allowing the commission to ignore other options.

The Governor said this rule leaves far too much uncertainty and warrants further explanation.


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues