Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

California's Conceptual Transmission Plan for Access to Renewable Energy Announced

California's Renewable Energy Transmission Initiative (RETI) last week announced the availability of its Phase 2A Report -- a conceptual transmission plan that evaluates the usefulness of potential transmission lines in accessing and delivering renewable energy. The plan is intended to help enable development and approval of renewable energy infrastructure in ways that minimize the economic cost, environmental impacts, and number of new transmission facilities.

The California Public Utilities Commission (CPUC), California Energy Commission, and California Independent System Operator (CAISO) formed RETI, and were quickly joined by Sacramento Municipal Utility District (SMUD), the Northern California Power Agency, and the Southern California Public Power Authority. RETI is a unique public-private partnership to consider the feasibility of building new transmission lines to access renewable generation from various areas of the state or possibly adjoining states and bring the power to population centers.

The first phase of RETI identified areas of the state and adjoining regions that have high densities of biomass, geothermal, solar, and wind resources. These areas are referred to as Competitive Renewable Energy Zones (CREZ). RETI Phase 2 work expanded the evaluation and re-ranking of CREZs and focused on the development of a statewide conceptual transmission expansion plan to access the CREZ.

The conceptual transmission plan is designed to meet the goal of obtaining 33 percent of the state's electricity from renewable resources by 2020. It was created with valuable input from an engaged Stakeholder Steering Committee comprising representatives of environmental groups; renewable developers; public and investor-owned utilities; state, federal, and local governments; Native American tribes; and consumers.

"Insufficient transmission is a major barrier to developing renewable power and bringing the power to where it is needed," said CPUC President Michael R. Peevey. "This report is the result of a process that has never been attempted before; a process that was designed to achieve consensus."

"Transmission planning will go hand in hand with the implementation of the Desert Renewable Energy Conservation Plan," said Commissioner Jeffrey Byron, presiding member of the Energy Commission's power plant siting committee. "The plan, as required by the Governor's executive order streamlining permitting and environmental review of renewable projects, will coordinate renewable generation and transmission development, while conserving precious habitat."

California ISO President and CEO Yakout Mansour added, "The ISO applauds the diligent efforts of the RETI parties. The work is foundational to successful implementation of California's renewable portfolio standard."

Jim Shetler, SMUD Assistant General Manager for Energy Supply on behalf of public utilities, lauded the stakeholders for their efforts in developing the Phase 2A Report. "The output from this report will assist those of us who have to plan, permit, and build transmission in making more informed decisions on integrating renewable energy delivery into our planning for grid reliability," he said.

In issuing this report, the RETI Stakeholder Steering Committee hopes that it will contribute towards building public understanding and support for the difficult task of building transmission. "Smart planning produces good results," said Johanna Wald of the Natural Resources Defense Council and member of the Stakeholder Steering Committee.

"RETI is the improved model for good planning: Anyone who plans a line from now on needs to realize that RETI has set a new standard for public involvement in all stages of transmission planning," according to Carl Zichella of the Sierra Club.

The report will be used by state and local agencies as well as utilities and members of the public in developing detailed transmission plans. Based on information available today regarding the potential for renewable development, the report:

  • Identifies additional transmission capacity to access and deliver renewable energy to meet the state renewable energy goals in 2020.
  • Evaluates relative usefulness of potential lines for accessing the delivering renewable energy.
  • Identifies potential transmission network lines for further detailed study by the California ISO and electric utilities.
  • Locates most conceptual lines in existing right of way and/or designated utility corridors.
  • Builds in environmental considerations and high level screening of conceptual transmission lines.
  • Incorporates a wide range of stakeholder perspective.

However, the report does not preclude study of other potential renewable development areas.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues