Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

TVA Identifies Preferred Route for Transmission Line

Tennessee Valley Authority has identified a preferred route for a new transmission line that will provide a reliable source of power to the Monroe area. The preferred route begins at TVA’s Livingston-Huntsville 161-kV line and extends east, northeast to a proposed new substation in the Monroe area of Overton, County. The 5.5-mile route is expected to have the fewest overall impacts of the alternatives studied. About two miles of the route will parallel TVA’s existing Livingston-Byrdstown 69-kV line.

This length of route has been reduced by two miles from the alternative routes presented at an open house in February.

The route would affect 21 tracts of property. TVA will work with property owners to obtain 100-foot easements for construction, operation and maintenance of the line. Property owners will be compensated for the easements at fair market value and retain possession of the property.

TVA is expected to begin acquiring easements for the transmission line right-of-way during the spring of 2009. Construction is scheduled to begin during the summer of 2009.

TVA’s decision follows receipt and evaluation of public input on alternative route segments. TVA’s objective in determining a route is to select the best overall path, weighing the same environmental, land use, engineering, and cultural considerations to ensure that overall project impacts, as well as impacts to the community at large, are minimized.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues