Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

Xcel Energy Recycles Towers and Right-of-Way

During 2004 and 2005, Xcel Energy Added Two Natural Gas Turbines at the Blue Lake peaking plant. The 350 MW of additional generation exceeded the existing transmission line capacity. The US$100 million project required replacing the existing 795-kcmil 26/7 aluminum conductor steel reinforced (ACSR) rated at 975 A at 230 kV with a higher ampacity conductor to deliver 1640 A at 115 kV. However, the line crossed an environmentally sensitive area along the protected Minnesota River Valley, complicating permitting and jeopardizing the deadline for upgrading the line.

DESIGN ALTERNATIVES

The line runs between two Xcel Energy Minnesota power plants: the Blue Lake plant in Shakopee and the Black Dog plant in Burnsville. To begin with, Xcel Energy considered two options for upgrading the line. However, both choices posed significant problems. The first option, replacing the existing ACSR with a twin-bundled 795-kcmil ACSR, would have required replacing all of the structures to accommodate the heavier weight of the additional conductor as well as the increased metrological loadings. All other options using conventional conductor solutions would have required replacing at least some structures or increasing some structure heights, as that conductor sags would meet National Electric Safety Code clearances.

The cost of new construction was a factor, of course, but an even bigger hurdle was the need to obtain new permits from the Minnesota Environmental Quality Board, a process that could take anywhere from six months to several years. Adding further uncertainty to the permitting process was that the Blue Lake to Black Dog line's right-of-way crossed the Minnesota River Valley and several of the river-associated wetlands, including a protected, rare type of wetland called a fen.

To address these issues and upgrade the line within the needed time frame, Xcel Energy evaluated and adopted a third alternative: a lighter-weight aluminum-based high-capacity conductor developed by 3M called aluminum conductor composite reinforced (ACCR).

Using a single 795-kcmil 26/19 ACCR conductor would meet Xcel Energy's capacity needs without requiring new structures or additional permits. The 795-kcmil ACCR is rated at 1553 A for continuous operation at 210°C (410°F) and 1778 A for emergency operation at 240°C (464°F). Sag calculations show that the 795-kcmil ACCR provides less sag than the other choices.

Choosing the single ACCR to avoid both replacing existing towers and the need to apply for a new permit also met another requirement. Xcel Energy needed to complete the additional electrical supply line into the Blue Lake Substation and have the line energized within four to six months. The ACCR could be installed within a few weeks, unlike new or replacement towers.

INSTALLATION DETAILS

3M provided 174,240 ft (53,108 m) of conductor on 5000-ft (1524-m) reels for the 3-phase, 10-mile (16-km) line. The installation, which followed IEEE 524 guidelines for both conductor and accessory installation, took eight weeks, starting on March 4 and ending by May 13, 2005. The line was immediately energized and has been in operation ever since.

The installation had to go through nonconventional areas, such as at a back-water lake of the Minnesota River, with limited access to towers and a freeway crossing. Normally, in Minnesota, a transmission upgrade such as this could have been done in the winter when the ground and wetlands were frozen, to avoid environmental damage. However, due to timing constraints, construction was in the spring when permitting constraints prohibited bucket trucks and other heavy equipment in the fens and wetlands of the Minnesota River Valley. In addition, where equipment was allowed, the ground had to be protected with heavy matting.

The second conductor pull was through the Black Dog Preserve. Because no heavy equipment could be used, the conductor had to be installed with a single pull. To accommodate one splice in each phase of the conductor, the splices had to be installed on the ground, and then the conductor with the splice had to be pulled through a sheave. The need for pulling splices over sheaves required the larger 46-inch (117-cm) sheaves, instead of the normal 15-inch to 36-inch (38-cm to 91-cm) ones. A setup tensioner and tugger were applied on each side of the lake to keep spans even while stringing. A 50-inch (127-cm) diameter bull wheel was used.

CONDUCTOR ACCESSORIES

Despite the unusual installation, all the accessories installed with ACCR on this line are exactly the same type of accessories installed on other ACCR lines since 2002. Some of those lines are subjected to extreme cold weather and ice loading, such as an installation in Fargo, North Dakota, U.S., as well as hot desert conditions, such as one in Phoenix, Arizona, U.S. In all installations, the accessories are performing according to expectations and have proven to be reliable, as extensive laboratory testing was conducted on the accessories and conductors before their commercialization.

Overall, the installation included preformed wire helical rod from Preformed Line Products (PLP; Cleveland, Ohio, U.S.), compression deadends and splices from ACA Conductor Accessories (Duncan, South Carolina, U.S.), PLP THERMOLINE high-temperature suspensions, ACA dampers and ACA HiTemp high-temperature and filler compound. Old and damaged insulators were replaced during the process.

ACCR is rated to 210°C (410°F) continuous operation. Using The Valley Group Inc.'s (Ridgefield, Connecticut, U.S.) rate kit thermal model to estimate conductor surface temperature at conservative emissivity values of 0.5 and 0.8 and zero wind velocity, a conductor surface temperature of about 170°C (338°F) was predicted at 1240 A.

Generally, however, the current transmitted through the line has been below 80% of the rated ampacity for continuous operation, leaving margin for additional demand growth. In addition, because the ACCR looks like the ACSR that was on the line before, the appearance of the line has not changed.

A high-resolution FLIR (Portland, Oregon, U.S.) infrared camera was used to scan the temperature profile of all accessories (deadends, splices, and terminal and jumper connectors) to identify any hot spots or problems with installation. This was done in the mornings in late September 2006 while the line was energized. All measurements showed that the accessories ran cool with no localized overheating. A few degrees rise with current energized was observed, with the highest measurement recorded for a jumper connector. Measurements are taken during the summer months when current loading is high.

ENERGIZED LINE

Despite unusual restrictions due to environmental issues, Xcel Energy and 3M successfully installed 795-kcmil ACCR conductor between the Blue Lake and Black Dog substations. Portions of the line had to be installed over sensitive environmental areas, making permitting and tower installation challenging. However, the use of ACCR simplified permitting and eliminated the need to replace towers, saving money and time, allowing Xcel Energy to meet its deadline. This was true despite the need to install the line without the use of heavy equipment in the environmentally protected areas.

As electricity demand increases, more current will be transmitted through the line. ACCR should be able to provide around 1700 A for continuous operation and slightly more than 1800 A under emergency conditions, allowing for at least a 20% increase in the load now carried by the line without another upgrade.

ACKNOWLEDGEMENTS

The author acknowledges the support of the 3M High Capacity Conductor staff, particularly Todd Staffaroni, Kamal Amin, Colin McCullough and Kay Gehring.


Kathy Beaman served as transmission engineer for Xcel Energy's Blue Lake project as part of her seven-year tenure as a civil engineer with Xcel Energy. She began her career working in construction management following graduation from Purdue University with a degree in civil engineering. Beaman currently is a transmission line design engineer with Great River Energy. She is a registered professional engineer. kbeaman@grenergy.com

Note: For further information about Xcel Energy's ongoing experience with the 3M ACCR conductor, please contact Xcel Energy's Ben Gallay at benjamin.j.gallay@xcelenergy.com.


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues