Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Let's Invest in People

As regulatory uncertainty gripped the utility industry in the late 1990s, many utilities decided to put their construction plans on hold. However, the Tennessee Valley Authority (TVA) took a different path, continuing to invest in the build-out of its transmission system. While other utilities were outsourcing entire departments, TVA kept its engineering and construction functions intact. In fact, TVA has been strengthening both of these vital functions over the last several years.

Growing our Talent

When I first met with my transmission planning department in 1999, it was frightening to look around the room and see all the gray hair (like mine). The days of downsizing, rightsizing and budget cutting had kept us from adding staff. Things have changed over the past six years, as we're hitting the university campuses once again. With the soft market for engineering talent, we find we are able to recruit the best and the brightest. However, we didn't just replace higher paid, retiring engineers with raw college recruits, we've developed a new progression program for engineering recruits that takes them from raw recruits to seasoned senior engineers in four to six years.

It's still scary to meet with the planning department but now for a different reason. We now have a bunch of well-trained, enthusiastic kids doing some of our most sophisticated analyses. And, they are doing a great job.

As with our engineering workforce, we also have increased our entry-level recruiting of craft personnel. We bring in two classes of electrician and linemen apprentices and at least one class of groundmen trainees each year. TVA's investment in craft training is paying dividends as these new workers fill the boots of those who are retiring.

Putting the Right Structure in Place

Our transmission line, substation and telecommunications project groups are self-contained, each encompassing both engineering and construction functions. Projects are directed by senior project managers who have no ties to product lines, which allows them to focus on the projects at hand.

We also have standardized and automated a great amount of our design work, drastically reducing the time to prepare designs, shaving engineering hours and cutting down on drawing errors.

Keeping Construction In-House

To assure that TVA could rapidly respond and recover from major emergencies, including storms and tornadoes, we kept our in-house construction crews. The wisdom of this decision has been proven over and over with record performance in numerous storm breaks. We routinely compare our crew costs with contract construction costs and work hard to ensure we are competitive. We also benchmark our safety records and annually rank at or near the top against large transmission providers.

To be cost-effective, we staff just below the low points in our engineering and construction workload projections and contract with our engineering and construction partners when our in-house resource capability has been exceeded.

We competitively select our contract partners, with contracts awarded for several years with options to renew. This reduces the high cost of orienting new firms to our standards and expectations.

Vendor Alliances

Alliances with equipment suppliers are key to our ability to buy equipment, satisfying TVA's technical requirements at competitive prices and meeting our fast-paced project schedules. For critical components, at least two strategic suppliers are competitively selected based on total ownership cost. We work closely with our suppliers in advance, enabling us to pre-source more than 95% of the items purchased on our capital projects.

Why We're Investing in Infrastructure

TVA's bulk transmission system has been one of the most robust in the nation. We were the first to build at 161 kV. TVA was first again in the United States when it began to build at 500 kV. When our 500-kV bulk transmission system was completed in the mid-1980s, TVA had transmission capacity to spare. But, with the sustained heavy regional load growth since then, the addition of our own generation, and the interconnection of 10,600 MW of merchant generation, TVA's bulk system is again being stretched. TVA is responding by building 500-kV substations — about one per year — and we are again planning, siting and designing 500-kV transmission lines.

Let's Get Building

As more utilities and transmission providers turn to expanding their systems again, they will find engineering and construction resources stretched, critical equipment being manufactured in distant countries, material escalation driving up costs and increasingly difficult siting issues. But, these are challenges that can and will be met if we are to keep the lights on — and we must.

David Hall is a vice president in TVA's Transmission/Power Supply Group, where he manages transmission planning, engineering and construction. Hall also has held engineering and management positions in nuclear, fossil and hydro over his nearly 33 years with TVA.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues