Optimizing Grid Performance with Substation Automation and IEC 61850

  • You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.

  • DOWNLOAD AUDIO
  • File size: 9.54 MB  File type: mp3
Dec 08, 2010

Summary: IEC 61850 is more than just a SCADA protocol. It also provides data collection, time synchronization, high-speed messaging, process bus functionality and more. This podcast shares how Black & Veatch is engaged with IEC 61850 industry efforts and how American Electric Power has put these enhancements to use through a pilot project using the GE BRICK product.


Discuss this Audio 0

Post new comment
or register to use your TDWorld ID
Connect

Latest News
Latest on T&D How™

Feb 16, 2017
Video
T&D How

Temporary Extension Arm Installation

As part of a distribution line changeout, National Grid installs a temporary extension arm onto an existing pole...More
Jan 29, 2017
Video
T&D How

Distribution Pole Installation 1

A National Grid crew installs a wooden distribution pole on Main Street in Uxbridge, Massachusetts....More
Jan 29, 2017
Video
T&D How

Primary Conductor Removal 1

In preparation for undergrounding, a National Grid crew de-energizes part of a distribution line....More
Dec 18, 2016
Video
T&D How

Drone Site Inspection 1

An unmanned aerial vehicle (drone) is used to do a site survey at an SDG&E battery bank installation....More

Transmission & Distribution World Online Buyers' Guide
Featured Jobs

More Jobs >>

Sponsored Introduction Continue on to (or wait seconds) ×