Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

330 kV Rzhevskaya Substation Brought On Line in St Petersburg

An official ceremony has been held to commission the new 330 kV Rzhevskaya substation, the first power grid facility of this voltage class to be built in Saint Petersburg and the Leningrad region over the past twenty years. The 330 kV Rzhevskaya Substation and overhead transmission lines were built under the Agreement on Interaction between the Saint Petersburg Government and RAO "UES of Russia" in ensuring reliable electricity supply signed in July 2006. The total amount of funds invested in the new substation project made RUB3.1 billion. North West Transmission Grids Branch acted as the customer and OAO "Sevzapeletrosetstroy" as the general contractor for the construction. The new subsuation will help relieve the load on the 330 kV Vostochnaya Substation, the key facility in the Leningrad energy system, which has experienced overload for the past few years. This will help improve the reliability of power supply in the North-East of Saint Petersburg.

The most advanced technological solutions and equipment were used to construct the Rzhevskaya substation. The substation has two 330-kV autotransformers with 200-MVA capacity and two 110-kV transformers with 40-MVA capacity. The facility also features compact outdoor 110-kV switchgear (OSG), the first one of the kind to have been installed in the Leningrad Energy System. The new switchgear occupies half the usual area for such installations.

In order to link the substation to the Leningrad Energy System, 4 km of 330-kV cable lines were built. between the Rzhevskaya Substation, the Kirishskaya TPP and the Vostochnaya Substation. Compared to overhead transmission lines, cable lines are more reliable, convenient and have a higher transfer capability. Moreover, cable lines are fully protected from adverse atmospheric effects, such as voltage spikes caused by lighting, wind load, glaze, and, importantly, are not accessible by unauthorized persons.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues