Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Fort Mojave Tribal Utility to Install 3M’s High-Capacity ACCR Conductor

Aha Macav Power Services, a utility owned and operated by the Fort Mojave Tribe in the southwest, will become the first Native American utility to deploy 3M aluminum conductor composite reinforced (ACCR), a revolutionary heat-sag-resistant overhead conductor that can carry more than twice the power of conventional lines of the same diameter.

Under an agreement with the Western Area Power Administration (Western), Aha Macav will install a new four-mile 3M ACCR line linking a new substation in Arizona to a switchyard in Needles, CA., a city on the western bank of the Colorado River. The new line will substantially boost power capacity and reliability for Needles and the surrounding area, which have been plagued by frequent electricity outages in recent years, often during periods of extreme high temperature.

“This is one of the most important and exciting projects we’ve seen here in many years,” said Robert Walker, utility manager, city of Needles. “It will end our power constraint and open up a world of possibility in terms of economic development.”

William Cyr, general manager, Aha Macav Power Services, said the project “provides a great benefit, both to our residents on the Fort Mojave Indian reservation and our neighbors in Needles. 3M ACCR represents a substantial technological advance in power transmission reliability that will contribute to economic growth and reduce the danger of power failures that pose a threat to health and safety.”

The Fort Mojave Tribe, whose reservation encompasses portions of eastern California, southern Nevada and western Arizona, is one of only a handful of tribes served by its own utility. Installation of the 3M ACCR is scheduled for September 2007.

Seven major U.S. utilities are already using or installing 3M ACCR, including Arizona Public Service in Phoenix, and Western, which is employing it to upgrade the reliability of the 80-mile Topock-Davis-Lake Mead line that parallels the Colorado River along Arizona’s western border with California and extends to Boulder Dam. The Aha Macav ACCR line will be linked to Western’s Topock-Davis-Lake Mead ACCR line.

Tim Koenig, who heads 3M’s composite conductor business, said deployment of 3M ACCR by utilities across the nation is accelerating because of the technology’s proven performance under a wide range of rugged climate conditions.

“We are excited to see 3M ACCR chosen as the solution to power this region, which experiences extremely hot temperatures. This is a new connection to Needles that did not exist previously, giving the city access to a low-cost, reliable power supply," Koenig said. He noted also that 3M ACCR has already had significant exposure to extreme southwest desert conditions, having been extensively field tested in Arizona by Western and the Salt River Project near Phoenix. “Lines in Phoenix and in Minneapolis have been subjected to extremely high electrical loads, particularly during the summer heat wave, and have consistently and reliably performed as expected.”

3M ACCR was developed with the support of the U.S. Department of Energy, which tested the conductor at its Oak Ridge National Laboratory (ORNL) in Tennessee, and with early contributions by the Defense Advanced Research Projects Agency. The ORNL tests demonstrated the conductor’s integrity after exposure to temperatures even higher than the rated continuous operating temperature of 210 degrees Celsius, which provides a significant safety factor. The fact that 3M ACCR is based on aluminum means the conductor is not adversely affected by environmental conditions, such as moisture or UV exposure, and it has the durability typically associated with aluminum-based conductors.

3M ACCR’s strength and durability result from its aluminum oxide (alumina) fibers, which are embedded in the high purity 3M aluminum matrix core wires, utilizing a highly specialized and patented process. The constituent materials are chemically compatible with each other and can withstand high temperatures without adverse chemical reactions or any appreciable loss in strength.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues