Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AltaLink, L.P. Reports Its 500 kV Transmission Project is on Schedule

AltaLink, L.P., Alberta’s largest electricity transmission provider, today reported its financial results for the first quarter ended March 31, 2006. The company recorded net income of $11.0 million before tax on total revenue of $50.2 million for the quarter, compared to net income of $11.9 million before tax and total revenue of $53.8 million for the same period in 2005.

In the first quarter of 2006, AltaLink continued to deliver on its mandate as a fully-regulated utility, providing Alberta with a stable, reliable and cost-effective transmission system. And as the demand for electricity in the province continues to grow, critical projects that support that growth are ongoing.

“The 500 kV development between the Edmonton and Calgary regions is the cornerstone of the expansion required to reinforce Alberta’s transmission system,” said Scott Thon, AltaLink President and Chief Executive Officer. “After consulting with more than 2,500 landowners, including more than 2,000 face-to-face meetings, and hosting nine open houses along the project corridor, the project continues on schedule. We are planning to submit our permit and licence application to construct the line in the third quarter of 2006.”

“This line will provide valuable benefits to all Albertans, including improved system reliability and increased efficiency that will reduce costly transmission line losses, equivalent to the electricity required to power a city the size of Red Deer.”

AltaLink is in the final stages of identifying the best overall route for the 500-kV transmission line. Through study and consultation, AltaLink has determined that a route built primarily adjacent to existing lines in the corridor will have the least overall impact based on social, land use, environmental and cost criteria. As per the project schedule, the company has initiated the spring environmental testing to complete the required environmental impact assessment for the project and is continuing to evaluate route options around the Genesee Plant, the Gleniffer Lake area and north of Crossfield.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues