Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

AEP/Allegheny Joint Transmission Venture Files to Establish FERC Rate

American Electric Power announced that Potomac-Appalachian Transmission Highline LLC, AEP's transmission joint venture with Allegheny Energy, has filed with the Federal Energy Regulatory Commission (FERC) to establish a transmission rate to recover costs for the approximately 290-mile, extra-high voltage transmission line that the companies propose to build from West Virginia into Maryland.

The companies are seeking a transmission cost-of-service formula rate, effective March 1, 2008, that will provide for annual updates to the amounts that PJM Interconnection (PJM), an independent regional transmission operator, will charge utilities to recover the costs of the project. The proposed rate includes recovery of a return on construction work in progress (CWIP) for the project and a return on equity of 14.3 percent, which includes an incentive award, consistent with federal policy to encourage significant transmission infrastructure and technology improvements. AEP and Allegheny each separately received FERC approval for incentive rate treatments for individually proposed transmission projects that ultimately became the joint Potomac-Appalachian Transmission Highline (PATH) project.

The PATH project includes approximately 244 miles of 765-kV extra-high voltage transmission from AEP's Amos substation near St. Albans, WV., to Allegheny's Bedington substation, northeast of Martinsburg, W.Va. Another 46 miles of twin-circuit 500-kV transmission will be constructed from Bedington to a new substation to be built near Kemptown, southeast of Frederick, MD. The total project is estimated to cost approximately $1.8 billion. PJM identified June 2012 as the date by which the PATH project needs to be operational.

"The PATH project addresses significant reliability concerns in the region, including overloads that will occur on more than thirteen existing transmission lines in Maryland, West Virginia, Virginia and Pennsylvania, as soon as 2012 if PATH is not built," said Michael G. Morris, AEP chairman, president and chief executive officer. "Establishing FERC rates for the project will provide the timely cost recovery necessary to obtain financing and allow us to move forward and bring the project on line in time to help prevent overloads on these lines."

Once approved by FERC, the costs of the PATH project will be allocated to all electric utilities that serve retail customers in the PJM region.

AEP and Allegheny plan to begin work on the routing study and environmental assessment for the PATH project in January 2008. The companies anticipate seeking regulatory approvals for the project from the utility commissions in both West Virginia and Maryland in the fourth quarter of 2008, following the completion of the routing study. AEP and Allegheny are committed to working with landowners, neighboring residents, business owners, affected communities and regulators to minimize the environmental and land use impacts of the project.

"To ensure that this project is the best option for improving reliability in this region, we've designed PATH with advanced transmission technologies that will make it the most reliable, efficient and environmentally sensitive project possible," Morris said. "Extra-high voltage transmission inherently costs less and requires less land to carry the same amount of power than other transmission designs. The six conductor-per-phase design of the Amos to Bedington 765-kV portion of PATH, a design pioneered by AEP on its Wyoming-Jacksons Ferry transmission project, will reduce line losses by more than 40 percent over older 765-kV designs. That means the line will transport more electricity and reduce the power generation necessary to meet electricity demand. Additional advancements in 765-kV and 500-kV conductor designs and new control technologies in the project's substations also will enhance the reliability and efficiency of the PATH lines compared with other transmission lines."

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues