Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP/Allegheny Joint Transmission Venture Files to Establish FERC Rate

American Electric Power announced that Potomac-Appalachian Transmission Highline LLC, AEP's transmission joint venture with Allegheny Energy, has filed with the Federal Energy Regulatory Commission (FERC) to establish a transmission rate to recover costs for the approximately 290-mile, extra-high voltage transmission line that the companies propose to build from West Virginia into Maryland.

The companies are seeking a transmission cost-of-service formula rate, effective March 1, 2008, that will provide for annual updates to the amounts that PJM Interconnection (PJM), an independent regional transmission operator, will charge utilities to recover the costs of the project. The proposed rate includes recovery of a return on construction work in progress (CWIP) for the project and a return on equity of 14.3 percent, which includes an incentive award, consistent with federal policy to encourage significant transmission infrastructure and technology improvements. AEP and Allegheny each separately received FERC approval for incentive rate treatments for individually proposed transmission projects that ultimately became the joint Potomac-Appalachian Transmission Highline (PATH) project.

The PATH project includes approximately 244 miles of 765-kV extra-high voltage transmission from AEP's Amos substation near St. Albans, WV., to Allegheny's Bedington substation, northeast of Martinsburg, W.Va. Another 46 miles of twin-circuit 500-kV transmission will be constructed from Bedington to a new substation to be built near Kemptown, southeast of Frederick, MD. The total project is estimated to cost approximately $1.8 billion. PJM identified June 2012 as the date by which the PATH project needs to be operational.

"The PATH project addresses significant reliability concerns in the region, including overloads that will occur on more than thirteen existing transmission lines in Maryland, West Virginia, Virginia and Pennsylvania, as soon as 2012 if PATH is not built," said Michael G. Morris, AEP chairman, president and chief executive officer. "Establishing FERC rates for the project will provide the timely cost recovery necessary to obtain financing and allow us to move forward and bring the project on line in time to help prevent overloads on these lines."

Once approved by FERC, the costs of the PATH project will be allocated to all electric utilities that serve retail customers in the PJM region.

AEP and Allegheny plan to begin work on the routing study and environmental assessment for the PATH project in January 2008. The companies anticipate seeking regulatory approvals for the project from the utility commissions in both West Virginia and Maryland in the fourth quarter of 2008, following the completion of the routing study. AEP and Allegheny are committed to working with landowners, neighboring residents, business owners, affected communities and regulators to minimize the environmental and land use impacts of the project.

"To ensure that this project is the best option for improving reliability in this region, we've designed PATH with advanced transmission technologies that will make it the most reliable, efficient and environmentally sensitive project possible," Morris said. "Extra-high voltage transmission inherently costs less and requires less land to carry the same amount of power than other transmission designs. The six conductor-per-phase design of the Amos to Bedington 765-kV portion of PATH, a design pioneered by AEP on its Wyoming-Jacksons Ferry transmission project, will reduce line losses by more than 40 percent over older 765-kV designs. That means the line will transport more electricity and reduce the power generation necessary to meet electricity demand. Additional advancements in 765-kV and 500-kV conductor designs and new control technologies in the project's substations also will enhance the reliability and efficiency of the PATH lines compared with other transmission lines."

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues