Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP and Allegheny 765-kV Transmission Project Approved by PJM

American Electric Power's 765-kV joint transmission line proposal with Allegheny Energy Inc. was approved by PJM Interconnection (PJM).
The PJM board included the Potomac-Appalachian Transmission Highline (PATH) project in their five-year PJM Regional Transmission Expansion Plan (RTEP) designed to maintain the reliability of the transmission grid. The PJM plan approves the building of 250 miles of 765-kV extra-high voltage trans- mission from AEP's Amos substation near St. Albans, W.Va., to Bedington substation, northeast of Martinsburg, W.Va. Another 40 miles of transmission, consisting of twin-circuit 500-kV transmission, will be constructed from Bedington to a new substation to be built at Kemptown, located southeast of Frederick, Md.

AEP and Allegheny announced plans April 18 to form a joint venture to build PATH. The total project is estimated to cost approximately $1.8 billion. AEP's estimated share of the costs will be approximately $600 million. The PJM RTEP calls for the PATH line to be put in service by June 2012 to meet the reliability needs of the region.

"PJM approval allows us to move forward with construction of a significant portion of the I-765(TM) transmission superhighway that is urgently needed to help relieve transmission congestion and enhance reliability in PJM. PJM's analysis shows that the transmission system in this region will be overloaded as soon as 2012 unless upgrades are made. This project will expand the benefits of 765-kV extra-high voltage transmission in PJM to enhance reliability and address issues preventing efficient flow of electricity into this area," said Michael G. Morris, AEP chairman, president and chief executive officer.

AEP and Allegheny expect to formalize their joint venture agreement for PATH within the coming weeks and file for incentive rate recovery from the Federal Energy Regulatory Commission (FERC). AEP and Allegheny also will begin work on a routing study and environmental assessment for the project. The companies will seek regulatory approvals from the utility commissions in both West Virginia and Maryland for the project following the completion of the routing study.

AEP will have lead responsibility for engineering, designing and managing the construction of the 765-kV elements of the project. Allegheny will have similar responsibilities for the twin-circuited 500-kV line. Each company will provide services to the joint venture for siting, acquiring rights-of-way, securing regulatory approvals from the states the line crosses and maintenance of the project.

The PATH project encompasses the first half of the AEP I-765(TM) Interstate Project, a 550-mile, $3 billion 765-kV transmission line proposed by AEP in January 2006. The remaining portion of AEP's proposed I-765(TM) Interstate Project from Kemptown Station into New Jersey remains under study by PJM and is not part of the joint venture.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.

  • Coming soon....

On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues