Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Alliant Energy WindConnect Constructs 230kV Transmission Line for FPL Energy Wind Turbines in Eastern Colorado

A 100-mile 230-kV transmission line under construction in northeast Colorado will connect the FPL Energy Peetz Table 400 MW wind turbines in Peetz, Colorado to the western grid at the Pawnee substation in Brush, Colorado. Two line segments make up this line: 78.2 miles being built by Hooper Corporation and a 21.5 mile segment being built by InfraSource Services under direction of general contractor Alliant Energy WindConnect.

The line consists of 795 ACSR bundled conductor on Sabre steel poles. The line is supported by approximately 1000 structures, 18 of which are engineered structures. Steel poles are used for the rest either direct embedded or direct embedment utilizing 48” culverts. The culvert is necessary to stabilize the ground in sandy soil so that the backfill can be compacted to hold the structure. Approximately 10 H-frame wood structures are utilized for existing transmission line crossings.

The terrain is very difficult to get into for line construction according to Mike McGuire, Project/Construction Manager, Alliant WindConnect, who says the line is being built largely across sand dunes. He said, “We are not allowed to use tracked equipment, so all construction equipment has to be on rubber tires. We use John Deere 4-wheel drive tractors to pull in all our equipment. As of the end of March, about 70 miles of line are framed and set. McGuire says conductor stringing began April 14th .

InfraSource is responsible for building 21 miles of line that leaves the ring bus east of the city of Peetz and leads to the wind field substation. Hooper Corp. is building the 78.2 miles of line that goes from Pawnee substation to the ring bus.

The project is scheduled for completion on July 15, 2007.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.

  • Coming soon....

On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues