Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

American Transmission Co. to Begin Construction on Cost-Saving Power Line

American Transmission Co. (ATC) will begin construction in September of a new, 35-mi high-voltage electric transmission line in south central Wisconsin. The line will allow local electric distribution companies to access lower-cost power produced in the region by extending an existing transmission connection to Illinois.

“By reducing transmission congestion and increasing transfer capacity, this project will improve access to lower-cost energy,” said Mary Carpenter, ATC local relations. “We will do our best to inform landowners of the impact of our work, while keeping disruptions to a minimum as we complete the project.”

The line is the first of its kind in the Midwest. Until this project, transmission lines in the region have almost exclusively been built to enhance reliability of electrical power in the area. Although improved reliability will be a by-product of the project, economics drove the decision to build. Local electric utilities will save through improved access to the wholesale electricity market and their savings will be passed on to end-use electricity customers.

The 345-kV circuit will be built on an existing transmission line right-of-way between the Rockdale Substation in the Town of Christiana in Dane County and the Paddock Substation located in the Town of Beloit in Rock County. The lines that extend south out of the Paddock Substation into Illinois create a path for importing power into Wisconsin.

Construction will begin with preparation of the rights-of-way for the line with tree trimming and pouring the foundations for the poles and is projected to be in service in 2010. Contractor partners include Kenny Construction Co., PAR Electrical Contractors, Inc., and Aldridge Electric, Inc.

Anticipated savings from the approximately $133 million project are expected to more than pay for its development.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues