Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ATC Unveils Final Dane County Route Options for Electric Transmission Line Project

American Transmission Co. announced the final route options for a proposed 345-kV electric transmission line through Dane County, Wis. between the towns of Middleton and Christiana.

The final routes proposed by ATC follow two basic east-west corridors. The northern route generally follows the Beltline and the southern route uses mostly rural areas offset from county highways. The Beltline route would be 32 miles long; the southern route, 55 miles. Some variations to the routes, which provide alternate connections or paths between the two routes, will be included in the construction application ATC will file this fall with the Public Service Commission of Wisconsin asking for authorization to build the transmission line.

“Even with recent improvements, the transmission system is operating at near maximum capacity,” said Mark Williamson, vice president of Major Projects. “This project reinforces the backbone of the system by providing the first major electric highway across the county for bringing electric power to businesses and residents throughout the ever-growing county. This line allows for the efficient and reliable use of the existing lower-voltage system. The bottom line is keeping the lights on. Our goal is to solve a critical electrical problem in the Dane County area that we know is real.”

ATC spent the past two years and thousands of hours analyzing dozens of possible routes for the line. This analysis along with input from the public and from local officials was used to reduce and refine the number of possible routes. The past year has been spent conducting a comprehensive evaluation of three preliminary routes, and further refining the options. The PSC requires at least two route options to be included in the construction application for regulatory review and consideration.

“The routing analysis for this project has been among the most complex we have ever faced,” Williamson said. “The input we’ve received from thousands of written comments and face-to-face discussions with potentially affected landowners, environmental groups, elected officials and community leaders has enabled us to better define project routes in a way that reduces impacts on the community and the environment.”

The year-long regulatory review will begin in October when ATC files its construction application for the project. The proposed transmission line is scheduled to be placed in service by summer 2013.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues