Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPA Crews Conduct Field Surveys for Transmission Line Improvements in Central Washington

Bonneville Power Administration crews are surveying near neighborhoods in Kittitas County, Wash., this summer to identify and catalog environmental and cultural resources that could be impacted by a proposed transmission line improvement project.

The environmental field surveys are part of a larger environmental review to help BPA decide whether and how to improve 14 miles of the Columbia-Ellensburg 115-kV transmission line in central Washington. If BPA decides to proceed, construction would likely begin in spring 2008 at the Ellensburg Substation and stretch 10 miles north to the Schultz Substation and then cover the four-mile stretch east toward the Columbia Substation. The project would be completed in June 2009.

The proposed upgrades, which include wood pole and hardware replacements, would help address line overloads in the area. “Our region continues to experience population increases and growth in business and industry,” said Mark Korsness, project manager for the improvement effort. “In turn, the associated increase in electricity consumption places more needs on our infrastructure.”

Some of the new poles will be 5 feet to 10 feet taller than the existing poles in this corridor, but will be placed as close to existing poles as possible. Also, a portion of the existing conductor on the line may be replaced to meet current industry standards.

BPA began an aggressive program in 2001 to build a number of major infrastructure projects to meet the growing demand for transmission services in the Northwest. The Columbia-Ellensburg project and others like it demonstrate a commitment to improving the reliability of the region’s transmission system.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.

  • Coming soon....

On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues