Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Brazil’s EDP Bandeirante Installs 3M ACCR for Line Upgrade

EDP Bandeirante, the power distribution unit of EDP Group in Brazil, has become the third Brazilian utility to install the 3M Aluminum Conductor Composite Reinforced (3M ACCR) for completion of a line upgrade while avoiding problems associated with building larger towers or expanding rights-of-way in an environmentally sensitive area.
3M ACCR provides more than twice the capacity of conventional conductors of similar size without requiring new or enlarged towers, thereby accommodating new demands being placed on the grid without costly and problematic construction, right-of-way expansion or permitting in crowded urban neighborhoods or environmentally sensitive areas.

EDP Bandeirante applied the advanced light-weight, low-sag, high-capacity conductor to a 4.9-km section of a line in eastern São Paulo State that intersects an Área de Preservação Permamente (Permanent Environmental Protected Area).

Tower construction and right-of-way expansion would have entailed lengthy permitting delays, severe costs and logistical problems with respect to the movement and size of equipment, plus the need to build a temporary parallel line while the existing line was de-energized for rebuilding, according to Fernando Peixoto Saliba, EDP Bandeirante’s engineering, planning and environmental executive manager.

“We originally considered a conventional ACSR upgrade, but the difficulties posed by construction in the protected area were significant,” says Saliba. “The innovative 3M ACCR solution saves us a lot of time and expense, allowing us to improve service about one year sooner on a line that was already operating at full capacity.”

EDP Bandeirante supplies power to 1.5 million customers in the regions of Alto Tietê, Vale do Paraíba and Norte Coast of São Paulo State. The 3M ACCR installation was done on the two-circuit 88-kV Cesar de Souza line, which serves residential customers in the city of Mogi das Cruzes and major industrial sites.

Two other utilities in Brazil – Companhia de Transmissão de Energia Elétrica Paulista, and CPFL – recently employed the 3M ACCR in upgrade applications that included river crossings and densely populated communities. Power companies in China, India and Canada, in addition to some two dozen U.S. utilities, also have embraced the 3M ACCR for similar applications.

Tim Koenig, director of the 3M High Capacity Conductor Program, says 3M ACCR’s growing international use, “especially in those countries whose economies and need for electrical power are most rapidly expanding, indicates that this conductor has become the reliable first-choice solution for upgrades where new construction would pose social, economic and regulatory obstacles. It is a proven, dependable, versatile and technologically advanced problem solver.”

The conductor’s strength and durability result from its core, composed of aluminum oxide (alumina) fibers embedded in high-purity aluminum, utilizing a highly specialized and patented process. The constituent materials can withstand high temperatures without appreciable loss in strength, even over long periods of time.

Also, since 3M's ACCR is based on aluminum, it is as not susceptible to environmental conditions such as moisture or UV exposure, as are other traditional conductors, and it has the corrosion resistance typically associated with aluminum-based conductors.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues