Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BritNed Marine Cable Lay Completed

The last section (22km) of the 260km long BritNed sub marine cable, a new electricity connection between the UK and The Netherlands, has been placed safely on the seabed. The cable laying works started in September last year and were carried out in six sections. The next phase will involve creating three offshore cable joints and another four land joints and burying the recently installed cable, which should all be completed by the end of September.


The two HVDC marine cables are bundled together and buried below the bottom of the North Sea using special cable laying vessels and a range of support vessels. The cables are buried at least a meter below the North Sea floor. Water depths can be down to some 50 m. BritNed cable is a bi-pole high voltage direct current (HVDC) electricity interconnector with a pair of high voltage cables bundled together. Due to the distance involved (260 km) direct current (DC) is used to transmit power through the cables that connect the converter stations on both sides. These stations were built by BritNed at the Isle of Grain in Kent (Great Britain) and at Maasvlakte – near Rotterdam (The Netherlands). At these locations, the electricity is converted back into alternating current (AC) and connected to the British (400kV) and Dutch (380kV) grids. 



Cable facts & figures


  • Voltage: ± 450 kV DC

  • Cable capacity: 1.000 MW

  • Weight 44 kg/m (single cable)

  • Length sea cable route: 250 km (two cables, bundled)
  • Length land cable route: 7 km (NL) and 2 km (GB), two cables, laid together

  • Conductor: 1 x 1430 mm2 Cu (copper)



ABB High Voltage Cables has been responsible for producing and laying the cable on behalf of BritNed.


Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues