Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

California Energy Commission Releases Proposed Changes for

The California Energy Commission released the Presiding Member's Proposed Decision (PMPD) for the Blythe Energy Project (BEP) Transmission Line Modification including a new substation and additional transmission lines. The Energy Commission Committee assigned to the Blythe Transmission Line project - comprising Commissioner John Geesman, Presiding Member, and Commission Vice Chair James Boyd, Associate Member - recommends the following changes to the Blythe Energy Project's Decision:

  • A midpoint substation connecting to Southern California Edison's (SCE) Devers-Palo Verde 1 (D-PV1) transmission line at either the "Proposed Midpoint Substation" location or the "Proposed DSW Midpoint Substation" location, to be chosen by project owner Blythe Energy LLC at its discretion.
  • A 6.7- or 11.9-mile (depending on the midpoint location chosen) transmission line connecting the new midpoint substation to the existing Buck Boulevard Substation.
  • Modification of existing switching equipment and the addition of new equipment, resulting in a small expansion of the Metropolitan Water District's (MWD) Julian Hinds substation near Hayfield.
  • A 67-4-mile transmission line between the Buck Boulevard substation and the Julian Hinds substation.

Blythe Energy LLC proposed transmission line modifications would allow electricity from the Blythe Energy Project (BEP) to be delivered to the California Independent System Operator-controlled electrical transmission system in Southern California. Blythe Energy owns a 520-MW natural gas-fired power plant within the city of Blythe in eastern Riverside County. In 2001, the Energy Commission approved the Blythe Energy application for certification for the BEP. The power plant began generating electricity in 2003.
The full Commission voted on October 11, 2006 to approve these proposed changes. More information about the PMPD is available at the Energy Commission website at: http://www.energy.ca.gov/sitingcases/blythetline/index.html

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues