Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

CL&P Upgrades Distribution System for Meriden, Connecticut

As part of its ongoing efforts to improve its electrical distribution system throughout Connecticut, The Connecticut Light and Power Co. (CL&P) is upgrading the system in downtown Meriden. CL&P will invest $4 million over the next two years to reconfigure and strengthen the circuits that serve the downtown area.

"We are redesigning the electrical system serving downtown," said Robert J. Drain, director of Western Division Operations for CL&P. "The first step involved upgrading our Center Street substation and we've done that." CL&P is in the process of ordering additional materials and will begin work again in late spring, which will include the replacement of nearly two miles of underground cables with newer, more efficient technology. When the work is finished, downtown Meriden will be separated electrically into five segments, instead of one. The design is such that, if there are problems, they will be isolated and easier to locate, with fewer customers being impacted.

The Center Street substation is a 13.8/4.8-kV substation. Previously, it was fed by four 13.8-kV feeders from a nearby Connecticut Light and Power facility. At Center Street, the four supply feeders were paralleled forming a 13.8-kV node that fed two 6.25-MVA 13.8/4.8-kV transformers and a 13.8-kV outgoing circuit.

The five 13.8 kv circuits and the two 6.25 MVA transformers were connected together by five line breakers and a bus sectionalizing breaker. Problems arose when one of these breakers failed to clear for a fault on one of the 13.8-kV supply feeders, ultimately resulting in an interruption of the entire system.

In response, CL&P decided to modernize and re-design this substation to eliminate the 13.8-kV node, and turned to engineers Kris Aberg, Don Chamberlin, and Jim Harkin.

This new design consists of two independent preferred-alternate transfer schemes; one per 6.25-MVA transformer. The outgoing 13.8-kV feeder has been eliminated by adding its load directly to the incoming feeders, fed by automatic pad-mounted switchgear. The 13.8-kV oil circuit breakers have been replaced with four new Cooper NOVA reclosers with Cooper Form 6 recloser controls. Two of the four new reclosers supply one 6.25 MVA transformer. One of the reclosers will be normally closed, and the other recloser will be normally open. If the normally closed recloser loses its source, the other recloser will close and pick up the 6.25 MVA transformer.

Four 13.8-kV circuits from a nearby bulk substation presently supply the downtown Meriden 125/216-V network secondary grid through eleven network transformers. The plan is to reduce the size of the network by removing fringe ends of the network and
re-supplying them as radial systems. Five of the eleven network transformers will be eliminated, and the load removed from the network will be fed with pad-mounted or submersible three-phase transformers. These transformers will be supplied by underground 13.8-kV three-phase loop circuits fed from new or existing pad-mounted automatic transfer switchgear.

In addition to reducing the size of the network, CL&P will replace in each manhole the existing network secondary manhole bus bar connections in the remaining sections of the network with rubber-molded limitered-crab connectors configured as a ring bus. The existing 500 kcmil copper network secondary cables will be replaced with 4/0 copper secondary cables. In general, two 4/0 cables are required to match the capacity of one 500-kcmil cable, but the reduced network size gives opportunities to reduce ampacity requirements as well. CL&P expects that by using 4/0 cable rather than 500-kcmil cable, the new network system will clear secondary faults faster, if there is a problem. Use of 4/0 copper cables should allow secondary faults to burn clear, or allow the cable limiters to isolate the secondary cable fault better than has been experienced.

The crews will need to pull in the new 4/0 copper cable, install the crab ring bus, and parallel up with the existing secondary. As cables are tied into the existing secondary, the existing secondary cables will be removed. There is not enough room in the manholes to accommodate the entire new secondary system, as well as the existing system.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues