Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

CL&P Prepares for Summer Peak Load with T&D Maintenance and Inspection Projects

The Connecticut Light and Power Company (CL&P) is in the final stages of a $30 million program to upgrade and strengthen its infrastructure across the state as the summer season – the time of greatest electricity consumption – approaches. CL&P’s preparations for this summer began in the fall of 2006, and are done annually to reduce the likelihood of service interruptions for customers.

"These proactive steps are far more efficient and cost-effective for us than just making repairs,” said Dana Louth, vice president for Energy Delivery Services at CL&P. “These improvements will go a long way to decrease both the number and duration of outages across our system, providing our customers with greater reliability. They are part of the $3 billion investment in our infrastructure we are making across the state over the next five years.”

CL&P has taken a number of steps to prepare for the peak demand summer months and better serve its nearly 1.2 million customers in 149 cities and towns across Connecticut, including:

-Installing additional transformers at substations that serve the towns of Clinton, Deep River, Greenwich, Manchester, Old Saybrook, South Windsor, Stamford, Vernon, Westbrook, Weston, Westport and Wilton. Additional transformers will help prevent larger-scale outages in the event of a transformer failure during periods of high customer demand;

-Performing special diagnostic inspections and follow-up maintenance on approximately 100 distribution substations in areas where heavy customer demand is expected or where failure of a single piece of equipment would result in long interruptions to large numbers of customers;

-Verifying the integrity and efficiency of cooling equipment at all major substations to ensure the equipment will be appropriately cooled to avoid equipment failures from overheating while carrying peak summer loads;

-Undertaking distribution system projects in 37 communities to increase circuit capacity – the ability to provide electricity to customers without compromising the delivery equipment when temperatures and electrical demand are at their highest;

-Conducting infrared surveys of the transmission lines (except for no-fly
zones) and all of CL&P's 235 substations. These surveys test and verify the integrity of the connections on major electrical delivery systems and help CL&P identify potential trouble spots;

-Completing foot patrols of the transmission lines to inspect electrical equipment and structures;

-Installing new distribution equipment and repairing existing equipment to optimize power delivery systems;

-Performing maintenance and upgrades on underground electric delivery systems to strengthen them;

-Working with ISO New England, within the provisions of Connecticut's 2005 Energy Independence Act, to encourage large commercial and industrial customers to consider conservation and load management measures during times of peak demand;

-Testing voltage reduction programs to verify the ability to temporarily reduce demand, if necessary;

-Reviewing and modifying operating procedures; and

-Continuing an aggressive educational and outreach effort to promote conservation measures across the state.

Many of these actions are focused on southwest Connecticut, an area of great concern for CL&P and the entire region. CL&P continues to move forward with several projects that will upgrade the existing transmission system to meet the growing demand for electricity in that part of the state.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues