Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Estlink Submarine Cable Becomes Operational

On January 2, 2007, ABB handed over the Estlink submarine cable to the Baltic and Finnish power companies. Electricity trade via the Estlink submarine cable commenced on Thursday, January 4.

After long-lasting negotiations ABB group and project’s shareholders reached an agreement on handover and activation conditions of the submarine link.

“The basis of the negotiations was the fact that Estlink contract did not set out a condition when the cable is activated using a temporary solution,” explained Indrek Aarna, Chairman of the Management Board of Nordic Energy Link. He added that prior to the completion of the cable some obstacles in testing have occurred, which, as of today, are solved using a temporary solution. “In order to solve the problem and bring the equipment in accordance with the contract, ABB has ordered additional solution, which will be installed at the Espoo and Harku converter stations in spring of 2007.

The Estlink cable, which for the first time will connect the power systems of the Baltic States and Finland, consists of both a submarine and an underground cable. In total, 210 km of cable was manufactured for the construction of the power connection between Estonia and Finland, of which the submarine cable constitutes 148 and the underground cable 62 km, respectively. The cable was inaugurated on December 4, 2006

The primary purpose of the Estlink submarine cable is to supply the Nordic electricity market with electricity produced in the Baltic States. An estimated 2 TWh of electricity will be transported annually via the cable. Partners in the Estlink project are Eesti Energia, Latvenergo and Lietuvos Energija in the Baltic States and Pohjolan Voima and Helsingin Energia in Finland.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues