Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Fingrid to Replace 400-kV Overhead Earth Wires

Eltel Transmission Finland and Fingrid have signed a contract on changing of earth wires for 400-kV lines during 2011-2012. The contract comprises replacement of 1100 km earth wire of which 400 km is optical ground wire (OPGW). These five lines are part of a critical interconnection between Finland and Sweden and are located in northern Finland. Fulfilling the required outage targets are of paramount importance in the contract. During the outage period the line under work is out of operation.

The need for replacement of old earth wires made of steel arises from a need to limit hazardous voltages close to the lines. The new earth wire type is made of steel reinforced aluminum alloy. The use of OPGW for certain sections is based on enhancement of communication lines.

"The new contract will be the third earth wire replacement project engaged by Fingrid and won by Eltel Transmission Finland. In the previous two projects all the outage targets were fulfilled. The client has also appreciated the high quality of delivered materials and our stringing works. In the latest completed project Eltel’s performance using Fingrid’s own scoring system awarded Eltel 26 points out of maximum 29 points, classifying Eltel as a "5 Star" Contractor", says Tapio Leskinen, director of Eltel Transmission Finland.

The overall length of replaced earth wire after this project will be 2350 km of which 600 km is OPGW. One 24-km section has been performed on de-energized line while fulfilling all requirements for live-line working conditions, utilizing tension and cradle block method for crossings.

In the execution of the projects above Eltel is utilizing its cross border resourcing by setting up teams from its Finnish and Polish Transmission units.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues