Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Georgia Transmission Corp. Completes Thomson-to-Warthen 500-kV Transmission Line

Georgia Transmission Corp. has completed a 39-mile 500-kV transmission power line connecting substations in Thomson, Georgia, and Warthen, Georgia. The line marks the company’s first project of its size in two decades, its first of many new lines in a major upgrade of the state’s power grid and a new design for 500-kV power lines.

Georgia Transmission, a not-for-profit cooperative that builds and maintains high-voltage infrastructure on behalf of 39 of the state’s 42 Electric Membership Cooperatives (EMCs), began planning for the $48 million project in late 2004. The 500-kV line, to be energized in the summer of 2010, is the largest type of power line built in Georgia. Georgia’s electric co-ops are not-for-profit utilities that provide power to more than four million Georgians.

“Georgia’s energy demand has nearly doubled since 1990 due to growth in population and per-capita energy use,” said John Raese, Georgia Transmission’s vice president of project services. “By fortifying the power grid, Georgia’s utilities are protecting all Georgians from increased outages and a greater risk of blackouts.”

Twenty meetings with the public and key stakeholders were held prior to final route selection. Irby Construction handled the construction, which began in early 2008 and added nearly $1 million to the local economy. Georgia Transmission will pay the counties through which the line passes more than $300,000 in property taxes in 2010.

“We are particularly proud that we delivered this project early and under budget,” said Jeannine Rispin Haynes, Georgia Transmission’s senior public relations representative. “The local communities’ input and cooperation was crucial to completing the project on time so EMCs can continue to provide affordable, reliable power to their members.”

The transmission line totals 38.7 miles, stretching through portions of Glascock (12.9 mi.), McDuffie (11.6 mi.), Warren (3.6 mi.) and Washington (10.6 mi.) counties. More than 366 miles of wires span across 158 latticed steel structures that average 140 feet in height. The transmission line right-of-way is 150 feet wide, encompassing 704 acres of land at a cost of more than $4 million.

The project is the first to use a new Delta Cat design that has a narrower footprint and better access for maintenance than the industry’s current horizontal and delta designs. Developed in cooperation with Georgia Power and Southern Company, Georgia Transmission’s design also has improved shields to guard against outages from bird contamination. It will be used on four other 500-kV lines the companies are planning and building in northern and central Georgia

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues