Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Idaho Power and PacifiCorp Anticipate Need for Major Transmission Development

Idaho Power announced the signing of a Memorandum of Understanding with PacifiCorp under which the companies would pursue possible development of new high voltage transmission lines from Wyoming across southern Idaho. The companies anticipate that various segments of the project under consideration would be completed between 2012 and 2014, and would be designed to meet growth in customers' need for electricity and increase electrical transmission capacity across southern Idaho.

"We've experienced significant load growth and see that growth continuing," said LaMont Keen, Idaho Power president and chief executive officer. "Under many conditions, our wires are at full capacity today. As a transmission provider, we have the obligation to plan and construct transmission facilities to ensure reliable electric service to our customers. The long lead times -- seven to ten years -- necessary to develop, site and construct transmission require action-in-advance-of-need in order to ensure a reliable system. We see opportunities to partner with companies such as PacifiCorp as an excellent way to ensure our ability to fulfill our obligation to serve and meet our mutual transmission needs."

The Memorandum of Understanding will serve as a cornerstone for the two companies to jointly study the development of the major transmission projects necessary to meet each company's needs. The expansion would utilize a "hub and spoke" design concept, which creates common points or "hubs" of major interconnection for electric load and generation resources. This design would allow for construction of the critical transmission lines necessary from load centers in advance of siting generation required to serve growth, while providing immediate benefits to system reliability. This flexible approach addresses the problem of coordinating longer lead-time transmission projects with shorter lead-time generation projects, while at the same time securing and efficiently utilizing critical transmission corridors.

"PacifiCorp has been actively participating in several regional transmission projects and believes this joint effort will support and help enable these regional project objectives," said John Cupparo, vice president of transmission for PacifiCorp.

Idaho Power's Energy Plan for the Future -- entitled the 2006 Integrated Resource Plan in regulatory filings -- articulates the need to expand the Idaho Power transmission system in order to deliver electricity from power generating sources to retail consumers. PacifiCorp has determined a similar need and, together, the companies are committed to develop transmission facilities to meet these needs and to operate reliable systems.

This would be the first major project to be developed under the regional planning role of the Northern Tier Transmission Group, a coalition of investor-owned and public utilities, state government agencies and transmission customers.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues