Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

New High-Voltage Substation at IJsselmuiden

Electricity transmission company TenneT and regional grid administrator Enexis are building a new high-voltage substation in the town of IJsselmuiden in the east of the Netherlands. The station, being constructed on Hagedoornweg, is needed to carry renewable electricity produced by glasshouse horticulture firms in Koekoekspolder to TenneT's high-voltage grid.


There is a sharp rise in locally generated electricity in the polder area of Koekoekspolder around IJsselmuiden due to the increasing use of combined heat and power (CHP) installations for glasshouse horticulture. In the years ahead the existing grid in Koekoekspolder will be insufficient to move this energy. It was therefore decided to build a new high-voltage station near IJsselmuiden. An underground cable will connect the station to the high-voltage line that runs between Kampen and Zwolle.


Construction of the station requires an investment of approximately €10 million. The first pile for this 'high and medium voltage station' will be driven into the ground later this month. The new high-voltage infrastructure is expected to be operational in the second quarter of 2011.


In recent years more and more glasshouse horticulture firms have taken advantage of the possibility to produce electricity by means of combined heat and power installations. Glasshouse horticulture currently accounts for 13% to Dutch production capacity (3,300 MW). TenneT is busily creating more high-voltage lines in other horticultural areas of the Netherlands to meet the growing demand for capacity. Measures include expanding the high-voltage grid at various places in the provinces of Drenthe and Limburg and in the Westland region near the North Sea coast.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues